20xx人教版英语八年级下册unit5whatwereyoudoingwhentherainstormcamesectiona1课件内容摘要:

nd fill in the blanks. 7:00pm 8:00pm 9:00pm What was Linda doing? Where was she? helping mom in the kitchen taking a shower sleeping in the bathroom in the bedroom Roleplay the conversation. Linda: Oh, I was in the kitchen helping my mom. Mary: What were you doing last night, Linda? I called at seven and you didn’t pick up. Linda: What was I doing at eight? Oh, I know. When you called, I was taking a shower. Mary: I see. I called again at eight and you didn’t answer then either. Mary: But then I called again at nine. Linda: Oh, I was sleeping at that time. Mary: So early? That’s strange. Linda: Yeah, I was tired. Why did you call so many times? Mary: I needed help with my homework. So while you were sleeping, I called Jenny and she helped me. 1. My alarm didn’t go off so I woke up late. alarm n. 闹钟 . What time shall I set the alarm for? 我该把闹钟拨到几点钟响。 2. I was waiting for the bus when it began to rain heavily. 1) begin v. (began) 开始 . The bell rings and the class begins. 铃响了 , 开始上课。 2) heavily adv. 在很大程度上。 大量地 . moving heavily 吃力地移动 It。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。