冀教版初中英语七年级上册单元测试-unit1-2内容摘要:

. He gave them to the hotel and they cooked them for guests, and he enjoyed himself very much. After 9 , he did this every day. But 10 he got his bill(帐单 ) at the end of the week, he saw it, “ For oil to cook fish(7 days), 70 pounds.” ( ) 1. A. fishing B. drawing C. singing D. lying ( ) 2. A. in B. on C. at D. with ( ) 3. A. lay B. waited C. sat D. looked ( ) 4. A. to watch B. to eat C. to find D. to beat ( ) 5. A. when B. since C. after D. because ( ) 6. A. river B. sea C. lake D. pool ( ) 7. A. On B. In C. At D. For ( ) 8. A. sad B. worried C. happy D. sorry ( ) 9. A. that B. this C. eating D. thinking ( ) 10. A. after B. when C. how D. why 五. 阅读理解( 15 分 ) (A) John is twelve years old. His sister, Mary, is two years younger than he is. One day their mother asked them to clean the house. Because they did a good job, their mother bought a delicious cake and said to John, “ John, cut this cake into two pieces, and give one piece to your sister. Don39。 t fet that you must do it like a good brother.” “ Like a good brother?” John asked.“ How does a good brother do?” “ He always gives the bigger piece to the other person.” answered the mother. “ Oh, I see.” said John. He thought about this for a short time, and then took the cake to his sister and said to her,“ Please cut the cake into two, Mary, and be a good sister.” 1. _________ cleaned the house very well. A. John B. Mary C. Jim’ s brother D. John and Mary 2. John39。 s mother asked him to give _________ of the cake to Mary . A. the bigger piece B. the smaller piece C. the better piece D. the more delicious piece 3. At last John asked _________ to cut that cake. A. his mother B. his brother C. Mary D. his friends (B) A young man once went into town and bought himself a pair of pants. When he got home, he went upstairs (楼上 ) to his bedroom and put them on. He found that they were about two inches long. He went downstairs to the kitchen. His mother and two sisters were washing up the teathings there. “ The new pants are too long,” he said.“ They need shortening (剪短 ) by about two inches. Could one of you do it for me, please?” His mother and sisters were busy and no one said anything. But as soon as his mother had finished washing up, she went quietly upstairs to her son’ s bedroom and shortened the pants by two inches (英寸 ). She came downstairs without saying anything to her daughters. After supper, the elder sister remembered her brother’ s pants. She was a kindhearted girl, so she went quietly upsta。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。