四川省20xx-20xx学年高二上学期第三次月考试题英语word版含答案内容摘要:
cooked or uncooked pork. Another type of tapeworm can infect beef. Signs of infection with a parasitic worm include a lasting headache, vomit(呕吐 ), and other signs of loss of appetite, weight loss and stomach pain. 28. Which is the best title for the text? A. The signs of infections with a parasitic worm. B. The ways to get infected with tapeworms. C. Risks of being infected with parasitic worm. D. Man39。 s life saved after tapeworm removed from brain. 29. How can we avoid infection with a parasitic worm? A. Don’t eat pork or beef. B. Cook food thoroughly. C. Protect intestine from infection. D. See the doctor with signs of infection. 30. What can we learn from the text? A. Ortiz’s case is mon. B. The tapeworm stops blood flowing. C. Ortiz was shocked at the infection. D. The tapeworm was dead when taken out. does the underlined word mean? A. Feeling sick. B. Feeling weak. C. Feeling sleepy. D. Having a fever. D Researchers at Stanford University have developed a new material that can move heat out of buildings and into space. The researchers say the material can cool buildings even on hot days. The cooling material is a very thin sheet with many layers that could be placed on a roof like solar panels(电池板) . However, instead of turning sunlight into energy as solar panels do, the material turns heat into infrared radiation(红外辐射 ). Shanhui Fan, an electrical engineering professor at Stanford University, says that the panels have a layer of material that is like sand. He says that the panels act like a mirror. They take heat out of buildings and reflect the light from the sun. He says both the heat and sunlight are sent 100 kilometers into outer space. It39。 s a structure that cools itself without using electricity, even under the sun. So, what it does is basically radiate heat to outer space and also reflect the sunlight, so it doesn39。 t get heated up by the sun. The panels are cool to the touch, even in the sun. Researchers say they can reduce the indoor temperature to nearly 5 degrees Celsius below the temperature outside. Mr Fan says it is like having a window into space. He says the heat is sent directly into space without warming the air. “In areas where there is no electricity, there is a significant potential benefit for storing medicine or even food. In many of these situations, being able to reduce the temperature is important. And this would provide a way to do it. They say the main problem is creating actual cooling systems using the hightech panels. They say it may be possible to develop a cooling spray that could be used on existing solid structures. The researchers believe the cooling spray technology could be developed in the next three to five years. They say as much as 15 percent of the energy used in the United States is spent providing power to air conditioning systems. 32. What is mainly talked about in the passage? A. A new material that cools buildings. B. New energysaving buildings. C. A new technology to store medicine and food.. D. A cooling system to replace air conditioners. 33. How does the material work to cool buildings? A. By making panels into mirrors with the material. . B. By absorbing sunlight and turning it into energy. C. By spraying water on the building structures. D. By radiating and reflecting heat. 34. What will the researchers do in the next years? A. Do more experiments to test the material. B. Develop a cooling spray for existing structures. C. Cut the cost of the cooling system. D. Promote the use of the cooling system. 35. What can we infer from the passage? A. The cooling system could save more energy for electricityshort area. B. The cooling system will surely be available in three or five years. C. The cooling system could have possible use in the US. D. The cooling system will take the place of air condition system. 第二节(共 5小题;每小题 2分,满分 10分) 根据短文内容,从短文后的选项中选出能填入空白处的最佳选项。 选项中有两项为多余选 Homesickness is a very mon experience, no matter what your age or background is. 36 It can bring about feelings of loss, sadness for the place and people you39。 ve left behind. Here are some tips to help you overe the feelings of homesickness. Get your mind off home by distracting yourself. 37 For example, you might think about the times you and your family don39。 t get along, make life hard for one another and even argue! Of course, there39。 s no need to overdo this but it does serve you well to remember that life is full of。四川省20xx-20xx学年高二上学期第三次月考试题英语word版含答案
相关推荐
( 2)将 ( g)通入容积为 10L的反应室, 在一定条件下发生反应 I,测得在一定的压强下 CH4的转 化率与温度的关系如图. ①假设 100℃时达到平衡所需的时间为 5min, 则用 H2表示该反应的平均反应速率为。 ② 100℃时反应 I的平衡常数为 (填数值)。 ( 3)在压强为 、温度为 300℃条件下,将 a mol CO与 3a mol H2的混合气体在催化剂作用下
2、,平均亩产 对照汕优 63 减产 不显著);两年区域试验平均亩产 对照汕优 63 增产 2003 年生产试验平均亩产 斤,比对照汕优 63 增产 栽培技术要点:1、培育壮秧:根据当地种植习惯与汕优 63 同期播种,因秧龄弹性大,以栽中苗为好;2、移栽:栽插方式以宽窄行为好,每亩栽 穴,基本苗保证在 10 万左右;3、施肥:重施底肥,早追肥,忌偏施氮肥。 超高产栽培过磷酸钙用量每亩不少于 25
to pick up his sister from her dance lessons? Do you know how we all felt when he hit another car and killed the two people in the other car? He died the next morning too. His sister walked home from
农业技术全集之植,叶汁治疗山羊疥螨病山羊疥螨病以皮肤瘙痒、脱毛、湿疹性炎症,并逐渐向周围扩延为特征,具有高度传染性,往往在短期内引起全群家畜的严重感染。 冬春寒冷季节发病率较高,夏秋季较少发生。 1、症状患羊疥螨检查阳性,病灶主要发生在腋下、乳房、鼠蹊、阴囊、四肢、耳根、颈部等无毛和稀毛部位,个别全身感染,患部绒毛脱落严重,呈皮炎症状,瘙痒剧烈,常靠圈墙磨擦。 2、治疗取烟叶 克,加水 50
D.通入 CO2过程中恒有关系式: c(Na+)+c(H+)=c(OH)+c(HCO3)+2c(CO32) A.图 ① 表示 25℃ 时,用 molL - 1NaOH 溶液滴定 20 mL molL - 1 盐酸溶液,溶液的 pH 随加入NaOH溶液体积的变化 B.图 ② 中表示反应 2SO2(g) + O2(g) 2SO3(g); ΔH0 的有关曲线 ,图中 三点中只有 b