牛津沈阳版英语九上chapter4fishingwithbirds模拟试题内容摘要:
anches _______________ ( cut) off, and logs _______________( make) .These heavy logs ________________( put) together in different ways and _________________ ( take) down to the foot of the mountains. Some of them _________________ ( float使漂流) down the small rivers and others _________________ ( carry) down on trains. Big trees ________________ ( cut) down in the mountains every year. Then young ones ______________________ ( must, plant) so that we ______ always ________________ ( can, have) enough wood. We have to take good care of mountains so that they __________ always _________________ ( may, cover) with growing trees. 【试题答案】 一、把下列句子变成被动语态 1. Some jewels were found in a box. 2. The pupils are being kept at school for a revision. 3. A parcel for you has been left by James. 4. The article must be finished before Friday.。牛津沈阳版英语九上chapter4fishingwithbirds模拟试题
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。