德马格注塑机工艺优化内容摘要:
troke to achieve 9598% fill Take sixteeen consecutive mouldings and determine the standard deviation of the weights. Print out: Page 21 Dosing Profiles Page 50 Process Statistics What has happened to the Dosing Stop position? 16 STEP FIVE RESULTS Insert actual values in the relevant boxes Mean value Range min max Weight without holding pressure Weight with holding pressure Percentage fill % Standard deviation (16 shots) g Melt cushion (mean and range) Dosing time (mean and range) Screw stop position (mean and range) Injection time (mean and range) Peak injection pressure, P inj. max Injection pressure at changeover, PN press. Changeover stroke 17 STEP SIX Optimise depression Find the depression speed which gives best screw stroke and melt cushion consistency. Set a depression stroke of 5mm. Check that you still achieve 9598% fill. Take sixteeen consecutive mouldings and determine the standard deviation of the weights. Print out: Page 21 Dosing Profiles Page 50 Process Statistics What has happened to the screw stop position? What is happening to the check ring? 18 STEP SIX RESULTS Insert actual values in the relevant boxes Mean value Range min max Weight without holding pressure Weight with holding pressure Percentage fill % Standard deviation (16 shots) g Melt cushion (mean and range) Dosing time (mean and range) Screw stop position (mean and range) Injection time (mean and range) Peak injection pressure, P inj. max Injection pressure at changeover, PN press. Changeover stroke 19 STEP SEVEN Optimise holding pressure profile Use the Holding Profile page to set a holding pressure profile which ensures a smooth transition from injection to the holding pressure phase and use a high enough pressure to pack the part properly. Add a step which reduces holding pressure gradually to zero. Take sixteeen consecutive mouldings and determine the standard deviation of the weights. Print out: Page 24 MWE Page 27 Holding Profile Page 50 Process Statistics Why do you need a smooth transition from injection to holding pressure? Why bother to reduce the pressure gradually if the gate has already frozen? 20 STEP SEVEN RESULTS Insert actual values in the relevant boxes Mean value Range min max Weight without holding pressure Weight with holding pressure Percentage fill。德马格注塑机工艺优化
本资源仅提供20页预览,下载后可查看全文
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。
相关推荐
心理咨询室和团体心理辅导室解决方案
积 915 平米,包括休息区域( 23 平米)和宣泄区域。 休息区:在入口处用挡板隔出 23 平米的区域作为休息区,宣泄区与休息区不必有窗 子,有门即可。 房间装修:避免声音对外界影响,天花板、地板、墙面、窗户采取隔音方式,为保证来访者安全,墙壁、地面采取软包方式。 为激发来访者的冲动,使其更好的宣泄内心不快,房间的颜色,以深色为主,最好为深蓝或深红。 3) 宣泄室的标准配置 ? 基础宣泄器材
徽派建筑的建筑艺术风格与特点
让手续和房产交易手续,取得完全资产权属。 物资、燃料供应有效管控。 制定了修旧利废管理制度,加强废旧物资处理,提高了物资精 细化管理水平;利用生产计划与物资计划平衡会,有效控制库存资金,库存管理居同行领先水平。 燃料方面,解决了三期不能接卸杂煤等难题,为机组安全稳定运行提供了可靠燃煤。 加强了煤质、煤价、海运费、速遣滞期费等指标的分析和管控,进一步理顺海运结算管理流程,优化煤种实际到货比例
心内科护士实习工作总结
兴。 有一部分心梗患者在恢复期间一直不错,不知什么原因发生猝死。 种种情况让我体会到心内科患者没有轻的,时刻应高度警惕,因为生命随时可能转瞬消失。 冠心病 (使用请双击 此处 删除页眉文字) 专业好文档为您倾心整理,谢谢使用 病人由于各种原因发生心衰,这时医生要以最快的速度给出治疗法案,护士要用最快的时间执行医嘱,高流量吸氧强心利尿等对症处理,看着患者心率慢慢降下来,心慌气短气喘症状缓解