高三英语虚拟语气(苏教版)内容摘要:
会去找他。 If he were here, everything would be all right. 如果他在这儿,一切都会好的。 典型例题 _____ to do the work, I should do it some other day. A. If were I B. I were C. Were I D. Was I 答案 C. 在虚拟条件状语中如果有 were, should, had这三个词,通常将 if省略,主语提前 , 变成 were, should, had +主语的形式。 但要注意,在虚拟条件状语从句中,省略连词的倒装形式的句首不能用动词的缩略形式。 如我们可说 Were I not to do., 而不能说 Weren39。 t I to do. 5 特殊的虚拟语气词: should 1) It is demanded / necessary / a pity + that… 结构中的主语从句的谓语动词要用should 加动词原形, should 可省略。 句型: (1)suggested It is (2)important that… + (should) do (3) a pity (1)suggested, ordered, proposed, required, demanded, requested, insisted; + (should) do (2)important, necessary, natural, strange It is suggested that we (should) hold a meeting next week. It is necessary that he (should) e to our meeting tomorrow. (3) a pity, a shame, no wonder 2)在宾语从句中的应用 在表示命令、建议、要求等一类动词后面的从句中。 order, suggest, propose, require, demand, request, insist, mand, insist + (should) do I suggest that we (should) hold a meeting next week. He insisted that he (should ) be sent there. 注意: 如 suggest, insist不表示 建议 或 坚持要某人做某事时 ,即它们用于其本意 暗示、表明 、 坚持认为 时,宾语从句用陈述语气。 The guard at gate insisted that everybody obey the rules. 判断改错 : You pale face suggests that you (should) be ill.。高三英语虚拟语气(苏教版)
相关推荐
ld / Had +主 +其他 Were I you, I would try it again. Had he been there yesterday, he would have seen the film. Should it snow tomorrow, we wouldn’t go out. If I were you, I would try it again. If he had
课 系列 II • 语言知识与技能类: 初级 英语语法与修辞 、 英汉初级笔译 、 英语应用文写作 、 英语报刊阅读 、 英语演讲与辩论; • 语言应用类: 文秘英语 、 科技英语 、 信息技术英语 、 初级旅游英语 、 初级经贸英语; • 欣赏类: 英语文学欣赏入门 、 英语影视欣赏入门 、 英语戏剧与表演入门 、 英语歌曲欣赏。 关于选修课程的说明 选修课程分为两个系列。 系列
固定搭配中是否多了词。 不定式前是否多了应该省的 to。 及物动词后受母语的影响是否多了介词。 二、多词 It is time of me to take my dog. _______ for 单句改错练习 3 I had knew him before he lived here. _______ Pass the book store, he stopped to buy a book.
Banks C James Gook and Daniel Solande D Daniel Solander and Joseph Banks (5) Joseph Banks39。 interests lay in ____ A astronomy and botany B botany and medicine C agriculture and botany D geography
all kinds of plants and animals .The weather was It was about noon we arrived at the foot of the mountain. The three of them were very we climbed the mountain . we fed monkeys,visiting temples and