高考英语“单选”简析内容摘要:

keep your word first. (湖北卷 ) A. so was I B. so did I C. so I was D. so I did 3. Well. I do think the rabbit is a beautiful, gentle animal which can run very fast. ______. (辽宁卷 ) A. So it is B. So is it C. So does it D. So it does 4. Mary never does any reading in the evening, ____. (全国卷 III) A. so does John B. John does too C. John doesn’t too D. nor does John 注意句型 “ so + 助 /情 /系 + sb. / sth” 与 “ so + sb. / sth. +助 /情 /系 ” 的区别。 1. The old tower must be saved, _______the cost. (浙江卷 ) A. however B. whatever C. whichever D. wherever 2. ____ I explained on the phone, your request will be considered at the next meeting. (浙江卷 ) A. When B. After C. As D. Since 3. At last, we found ourselves in a pleasant park with trees provi。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。