高二英语下学期选修八复习内容摘要:

n C. to D. under For instance / for example in / out of There are many good things about 39 in the Third World. Take the close and constant relation between children and their parents, relatives and neighbours for example. In the West, the very nature of work puts distance between 40 and children. But in most Third World villages mother and father do not go miles away each day to work in offices. 41 , the child sees mother and father, relations and neighbours working 42 and often shares in that work. 39. A. childhood B. poverty C. spirit D. survival 40. A. adults B. fathers C. neighbours D. relatives 41. A. Anyhow B. However C. Instead D. Still 42. A. away B. alone C. along D. nearby A child 43 in this way learns his or her role through joining in the munity39。 s 44 : helping to dig or build, look after animals or babies rather than 45 playing with water and sand in kindergarten, keeping pets 46 playing with dolls. 43. A. growing up B. living through C. playing D. working 44. A. activity B. life C. study D. work 45. A. by B. from C. through D. with 46. A. and B. but。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。