高二英语passive-ingform内容摘要:
____ by his boss (shout at) being shouted at • After _______________ for failing the exam , the child started crying. (blame) being blamed • Peter is excited about _______________ to the party (invite) being invited • The woman doesn’t like ______________ by anyone. (keep waiting ) being kept waiting p22 • 1. being attacked • 2. Being held up • 3. Being included • been accepted • 5. bein。高二英语passive-ingform
相关推荐
of copper and bronze. skills to make copper were through trade and cultural links. 10. The gold earrings came from France. F F T T F Britain west Europe Step 5 choose the best answer 1. Which are not
B. wall / fence C. limit ABC3. historic: adj. having importance in or influence on history (Line 6) 11 November 1918 is a historic day as it represents the end of World War I. Can you tell me when
you found your book? His advice ought to be asked for When will the wall be painted? Has your book been found? Group three 1 We must take good care of the children. 2 We have never heard of such
ver… Mary is an indoor type。 however, Tom enjoys swimming, camping and tennis. while… Mary is an indoor type, while Tom enjoys swimming, camping and tennis. ________ Tom, Mary is also interested in
ould Jane hope to run prosfessionally again. 5). Only in a film can people get hit and never seem to feel the pain. 6). Not only did Zhou Jie receive an admission notice to Beijing University, but he
Answer the question in C1 on page 20. 1. About 2500 years ago. 2. In 1987. 3. It can also help reduce the risk of heart attacks by thinning blood, prevent a stroke, reduce the risk of colon cancer,