高三英语非谓语复习内容摘要:
rry out ing 形式 [例 ] NMET1998 European football is played in 80 countries, ___ it the most popular sport in the world. A. making B. makes C. made D. to make A Making it the popular sport in the world为现在分词短语作结果状语,这类分词短语常放在句子的后面。 如: His parents died, leaving him an orphan. 1. The speaker raised his voice but still couldn’t make himself____ . (NMET91 34) B. to hear C. hearing D. heard 2. On afternoon, Mrs Green went to the market, ____ some bananas and visited her cousin. (NMET91 23) A. bought B. buying C. to buy D. writing 3. I usually go there by train. Why not ____ by boat for a change? (NMET92 14) A. to try going B. trying to go C. to try and go D. try going 4. ____ a reply, he decided to write again. (MET92 39) A. Not receiving B. Receiving not C. Not having received D. Having not received 5. How about the two of us ____ a walk down the garden? (MET93 17) A. to take B. take C. taking D. to be taking 6. ____ down the radio the baby’s asleep in the next room. (MET93 24) A. Turning B. To turn C. Turned D. Turn 7. Charles Babbage is generally considered ____ the first puter. (MET93 34) A. to invent B. inventing C. to have invented D. having invented 8. I must apologize for ____ ahead of time. That’s all right. (MET。高三英语非谓语复习
本资源仅提供20页预览,下载后可查看全文
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。
相关推荐
高三语文准确鲜明生动
复杂、晦涩难懂的长句。 ( 3)恰当运用修辞手法,做到表达 “ 鲜明 ”。 比喻、对偶、对比等修辞能增强语言表达的鲜明性,独具特色,借助修辞格来增强语言表达的鲜明性,是一条切实可行的途径。 “生动 ” 就是表达能充分调动人们的形象思维,使表达具体形象可感。 生动的考查在简明得体、选用仿用变换句式、压缩与扩展和修改病句等题目中均有体现。 三、生动 1.恰当使用动词、形容词
高三英语阅读理解题型及技巧
that a kleptomaniac steals are seldom of great value. They often give away what they have stolen or collect objects without using them. 3 • Q:What is the topic of the text? • A. Young Thieves. • B.
高三英语阅读理解技巧
blue eyes entered the beautiful hall of the Bell Tower Hotel in Xi’an with his bicycle. The hotel workers received him and phoned the manage, for they had never seen a bicycle in the hotel in the