广州版冠词复习内容摘要:

例7 ____ browns are watching TV at home at the moment. A./ B. The C. Mr. 分析 the放于姓氏的复数形式前时,表示一家人或一姓的夫妇二人。 B 例 8 He will go to see you off at ____ Railway Station. A. a B. an C. the D./ 分析 the+普通名词构成专有名词。 the United States/ the United Nations the People’s Republic of China C 例9 I was playing ____ piano at eight yesterday morning. A. a B./ C. the D. this 分析 play+乐器表示弹奏时,该乐器名词前加 the。 Alice likes to play the violin while Kate likes to play the flute. 表示数量时可用 a。 This is a new piano against the wall. C 例 10 Our teacher gets up early in ____ morning. A. the B./ C. a D. an 分析 牢记一些含 the的习惯用语,在句中用作时间状语。 in the afternoon (evening)/ in the daytime at the beginning/ in the end A 例 11 There is a large ship in ____ middle of the river. A. a B./ C. the D. any 分析 牢记一些含 the的习惯用语,在句中用作地点状语。 on the right (left) in the front of in the middle of the meeting / the forest at the foot of the hill C 例 12 Last night we went to ____ cinema. A. the B. a C./ D. those 分析 牢记一些固定搭配: go to the concert (theatre) A 例 13 ____ young should care for and help ____ old. A. The, a B. The, the C. A, the D. An, an 分析 the+形容词(形容词名词化)表示一类人或事物。 the poor / the rich / the sick / the beautiful B 例 14 The small town lies on ____ Yangtzi River. A. a B. an C./ D. the 分析 定冠词 the用在江河、海洋、山脉、湖泊、群岛名称的前面 the Dead Sea / the Black Sea the North China Plain华北平原 D 二、不用冠词的场合 例 1 Paper is made of ____ bamboo. A. a B. the C. / D. that 分析 物质名词和抽象名词前一般不加冠词。 Wood can be made into chairs and tables. Iron is a kind of metal. C 例2 ____ January is the first month of the year. A. The C./ D. That 分析 表示节日、月份的名词前一般不加 the。 Spring is ing. He was born in December. 如果表示有某年限定的季节和月份时,季节和月份前要加 the。 He was born in the Summer of 1964. C 例3 We have no classes ____ Sundays. A. the B. these C.\ D. those 分析 表示一周中七日的名称前一般不加冠词。 C 例4 I studies ____ English in ____ England.。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。