薪酬方面外文翻译中英文内容摘要:
① β i≈ 1。 (i=1,… ,m) ② β 1≈β 2≈ … ≈β m m = numbers of types of work. Condition ① requires the rationality of absolute wage level, β i 1 means the wage level is too lower, and it should result in the abdicaterate of workers, which will be high。 β i 1 indicates that the wage level is too high and it should result in the increase of product costs, in this case the hourly rate should be reduced appropriately. Condition ② is the rationality requirement of the relative wage level. Obvious difference inβ i reflects the fact that workers doing different jobs receive unfairly pay, which will easily make the workers feel unsatisfied. Adjustment measures should be made as soon as possible. When trying to adjust the hourly rate of any job, the managers should explain adequately the reasons to the workers and convince them to accept the adjustment. Sometimes, multistep gradual adjustment is a necessary strategy for the successful and smooth transition to a new piece rate level. B. The Method of Adjusting Piece Rate Standard Many factors should be taken into account when determining the piece rate standard. First, technical skills required and work intensity of different jobs should be thought over. Generally, jobs requiring high technical skills and work intensity deserve a relatively higher piece rate。 another factor is the percentage of wages in total production value. This is related with the management level and labor productivity. The third one is the difference between the pany39。 s present wage level and the enterprise39。 s average level. When workers have lower wages than those working in other panies with the same job level, they may leave the pany, and the demission rate will increase. When setting the piece rate level, the fairness principle should be adhered to, thus to arouse the workers39。 enthusiasm. Piece rate setting should follow a two step model: first, based on the previous year39。 s real wage data and output value, one can get the mean wage rate KeV: Sj=Total wages in period j。 Vj= Output in period j。 n =statistic period. If real wage rate is higher than industry average, deep analysis should be conducted to find out whether it is because of the high real wage rate, or because the existence of management problems. This serves as the basis of adjusting wage level. By analyzing the rationality of real wage rate, and considering the industry39。 s average real wage rate, the pany39。 s target profit rate and planed cost may be reached. We can set the planed wage rate,。 next, based on product price and planed wage rate, we can decide product piecerate, and further, planed working procedure piecerate according to the following method: 1) Piecerate based on planed wage rate: P = unit product price。 = product planed wage rate。 2) Workingprocedure piecerate based on planed hourlyrate: t i =manhour quota of workingprocedure i。 3) Product piecerate based on planed hourly rate: m= numbers of workingprocedure of product. 4) Determine the piecerate adjustment coefficient: 5) Determine the batch modification coefficient .The batch of orders varies greatly in madetoorder enterprises. According to the learning curve theory, the batch has significant influence on productivity, so, there should be a batch coefficient to modify the piecerate, for example, for batch less than 200 pieces, =。 for batch of 200 to 500 pieces, = , batch of 500 to 1000 pieces, = , etc. 6) Adjusted the piecerate of working procedure i: C. Tie the Wage in with the Quality and Material Consumption In outputbased system, to prevent the workers from focusing more on quantity than on quality and cost, quality and cost control variables should be included in calculating the workers39。 wages. The follow equation can be used: Se= a worker39。 s modified wages based on piecerate。 N =total output finished by a worker。 Kq =average rejectrate。 Km= reward or punishment rate related to material consumption (usually, Km =)。 h = numbers of workers related to the material consumption. Cq, Cr is material consumptionquota and real material consumption respectively. The average rejectrate k is calculated based on the product values under multivariety products conditions according to the following equation: Vi = values of products checked in batch i。 n I = numbers of rejectproducts in sample products from batch i。 Ni = numbers of samples in batch i。 m= numbers of batches of this month。 Approach to adjust the piecerate of output based system The approach and flow chart to adjust the piecerate level is express as figure 1. IV. ALLOWANCE FOR WELFARE AND CRAFTSMANSHIP The above output based system is based primarily on piecerate, plus craftsm。薪酬方面外文翻译中英文
相关推荐
的设备、材料的生产经营,如文具、印刷设备、广播电视设备、电影设备的生产经营等;与文化、娱乐相关的其他活动,如工艺美术、设计等。 根据《文化及相关产业指标体系框架》的界定,以新闻出版、广播影视、文化艺术为主的行业为文化产业核心层,以网络、旅游、休闲娱乐、经纪代理、广告会展等为主的新兴文化服务业为文化产业外围层,以文化用品、设备及相关文化产品生产和销售为主的行业为文化产业相关层。 创意产业的定义
所属 电影 制片厂在 2020 年底前尚未完成转制任务的,将视为自动退出,年审时不再核发电影拍摄许可证。 即将出台的报刊改革意见中,也专门就不符合改革要求、不具备市场生存条件的报刊退出问题作出政策规定。 对国有经营性文化事业单位转制“不可逆”、不能走“回头路”提出具体标准,也是建立文化体制改革约束机制的重要内容。 凡列为转制范围的,转制是否完成,一要 看是否 完成企业法人工商 登记 ,二要看是否
施工组织设计审批手续等。 完善项目经理、施工员、质量员、安全员等的上岗证。 要求基础施工结束前完成。 (二 )施工安全达标 施工安全达标是实现创造文明工地的关键,为切实作好安全生产管理达标的各项工作,实 现零伤亡,控制重伤事故,机械事故,减少一般事故的目标,现制定以下工作计划。 安全达标管理: 贯彻执行“安全生产,预防为主”的方针,树立“以人为本,第一分公司 安全高于一切”的观念
经济处罚;违规贷款 100 万元以上,责令收回,给予留用察看以上处分和经济处罚。 给予处分或处理由承办组根据实际情况提出,一般降级处分与解聘职务处理同档,依次类推。 经济处罚:一般操作违规处罚由专业部室或稽核部门按规定给予罚款或扣分兑现;侵占、挪用等退赔(含资金占用费)须全额兑现;贷款责任按《贷款责任追究办法》办法处理。 第七章 附 则 第三十一条 本办法由 ##
之后继续进行游戏的相关入门教学,第一次接触的玩家可以仔细了解整个游戏的任务和快速旅行系统。 yxcsbzgj/ 鬼泣 5战斗心得 轩辕剑 6 qqq 单个敌人较强的就是双刀和带刺狼,暴君。 群战则很多敌人要优先解决,特别是飞天类和 女巫,骚扰能力一流。 多数小型敌人挨斧子打会弹飞掉,必须用飞镖的 B 先定住再打,就3 斧子全中了,斧子的 YY,停顿 Y是最大威力招式,速杀相当好用。
设计、制造的“内装型” PLC,它从属于 CNC 装置,与 CNC 共用计算机内部即可实现。 本文采用的是第一种类型, PLC 独立于 CNC 装置, PLC与 CNC 信号在 CNC装置内部传送,而 PLC与机床电气控制信号通过 CNC的 I/O接口传送。 PLC 作为 CNC 的基本功能而统一设计和制造,因此结构十分 紧凑; PLC控制程序编程完成后,传送到CNC装置中