leedga考试模拟题c组内容摘要:
ltiple bins would increase space requirements, pared to ingled recycling. Locating bins in the basement would deter recycling due to the inconvenience involved. Question 17 Show Answer Legend What important documents should be created for the purpose of selecting the design team? A Request for qualifications B Operations and maintenance manuals C Statement of work D Bidding documents Notes: Reference: Sustainable Building Technical Manual Part II, pg. 6 From the guide: 39。 The Statement of Work (SOW) includes the project criteria, including green building issues. The Request for Qualifications (RFQ) identifies the skills required for participation in the project, including green building expertise.39。 Question 18 Show Answer Legend What resources are available to team members to find more information about other LEED projects? A USGBC39。 s monthly magazine B LEED Online C USGBC Chapters D USGBC publications Notes: Reference: USGBC website USGBC publications provide information about LEED projects. USGBC Chapters are local resources that help spread the word about LEED. USGBC has no monthly magazine. LEED Online is for use by the project team and does not contain information about other projects. LEED Online can be used to show/restrict public information about the project. These public facing details can be viewed using USGBC project search tool on their website. Question 19 Show Answer Legend What tool is used to determine the target certification level? A LEED Score Card B LEED Online C EPA39。 s Target Finder D CIR Notes: The LEED Scorecard helps teams decide what credits to achieve. Question 20 Show Answer Legend How many points are listed for prerequisites on the LEED Scorecard? A 1 B 2 C 0 D 18 Notes: Prerequisites are required and are not assigned any points. Question 21 Show Answer Legend How can the site boundary differ from the LEED project boundary? A The site boundary is the property line while the LEED project boundary the portion of the site submitted for LEED B The site boundary is the portion of the site submitted for LEED while the LEED project boundary marks where the LEED project ends C They are exactly the same D They can be the same, but site boundary includes only the area submitted for LEED Notes: USGBC Definition of LEED project boundary portion of the project site submitted for LEED certification. For single building developments, this is the entire project scope and is generally limited to the site boundary they are not necessarily the same thing. Question 22 Show Answer Legend What type of fixture can earn EPA39。 s WaterSense label? A HET dual flush toilet B Kitchen sink faucets C Washing machine D Dishwasher Notes: Reference: EPA WaterSense WaterSense helps consumers identify water efficient fixtures. The WaterSense label applies to showerheads, toilets, urinals, and bathroom sinks. Kitchen sink faucets do not usually e in low flow varieties or with flow restrictors because these would only serve to make it take longer to fill up a pot of water rather than save water. Question 23 Show Answer Legend What does the Montreal Protocol ban? A CFCs B Coalfired power plants C Mercury in light bulbs D Incandescent light bulbs Notes: Chlorofluorocarbons (CFCs) are now banned under the Montreal Protocol. Refer to the Treatment by LEED of Environmental Impact of HVAC Refrigerants. Under the Montreal Protocol, CFC production in the United States ended in 1995. To implement the Montreal Protocol, the EPA established Section 608 of the EPA Clean Air Act for regulating the use and recycling of ozonedepleting pounds. Question 24 Show Answer Legend A project will include underground parking. This change can have a positive impact on what issue? A Community connectivity B Pedestrian access C Heat island effect D Parking capacity Notes: The heat island effect would be reduced because the parking has been moved underground. The parking capacity would remain unchanged. Pedestrian access to the surrounding buildings and services would not be affected. The heat island effect is created when developed areas have higher temperatures than surrounding rural areas. An urban heat island effect is caused by sunlight heating up dark colored surfaces such as roads and rooftops. Huge quantities of heat are generated in buildings that have dark rooftops and absorb heat rather than reflect it. LEED defines a heat island as one whose temperatures are at least 10 degrees higher than those of surrounding suburban or rural areas. Question 25 Show Answer Legend Which items are considered preconsumer recycled content? A Excavated soil B Wooden pallets used by a shipping pany C Leftover drywall from a renovation D Magazine overruns Notes: Preconsumer content is content from industry scraps that was diverted from the waste stream and used for other purposes. Examples include sawdust, wood shavings, wood chips, and print overruns. Excluded are materials that are reincorporated into the same manufacturing process that generated it. Print overruns are considered preconsumer recycled content. Pallets are postconsumer waste since the shipping pany did not manufacture them (they used them, they did not make them). Question 26 Show Answer Legend Which of the following strategies have earned innovation in design / operations in the past? A Implementing an ed。leedga考试模拟题c组
相关推荐
筑整体及环境相协调。 玻璃幕墙立面分格尺寸应与玻璃板的成品尺寸相匹配。 立面分格的横梁标高宜与附近楼面标高一致,其立柱位置宜与房间划分相协调。 玻璃幕墙的开启部分面积不宜大于幕墙墙面面积的 15%;开启部分宜采用上悬式结构。 玻璃幕墙的设计应能满足维护和清洗的要求。 玻璃幕墙高度超过40m时,应设置清洗机,并应便于操作。 玻璃幕墙的性能要求 玻璃幕墙的性能一般包括下列项目: 风压变形性能;
沥青稳定碎石混合料马歇尔试验配合比设计技术标准 表 注: ① 在干旱地区,可将密级配沥青稳定碎石基层的空隙率适当放宽到 8%。 注: ① 对集料坚硬不易击碎,通行重载交通的路段,也可将击实次数增加为双面 75次。 ② 对高温稳定性要求较高的重交通路段或炎热地区,设计空隙率允许放宽到 %, VMA允许放宽到 % (SMA16) 或 16% (SMA19), VFA允许放宽到 70%。 ③
\TOOLSnode↙ 运行后将生成为 的文件,其中显示检查结果。 注: NODE 运行后生成的结果文件将覆盖原有的文件内容。 通过编辑器查看结果文件 C: \TOOLSedit node .txt↙ 进入文本编辑器,观察生成文件内容,检查将会有相应的检查结果和逻辑内容。 用其它文本编辑器也可打开文件,内容可以通过各种文本编辑器打印。 在设置用电脑(笔记本)可以以同样方式操作。 十三、数据保存
警漏报的现象。 配置管理 A、系统参数配置 只有在具有系统参数修改操作权限的操 作者才能对整个系统软件的运行参数、数据管理参数、报警参数等进行配置、修改,以上操作均可在线进行。 B、监控参数配置 同样只有在具有权限的操作者才能修改监控对象的监控参数,包括新ASXD 机房监控 设计方案 12 增、删除、修改监控对象的监控参数及告警输出的颜色、声音或输出方式的修改,所有修改监控参数操作均可为在线时
的非预期使用;对要销毁的作废文件,办公室负责销毁。 c) 文件的借阅、复制: 借阅、复制与质量有关的文件,由办公室负责审批后办理相关手续 ,填写《 文件借阅、复制登记表 》。 办公室负责收集有关国家、行业、国际标准的最新版本,加盖“受控”印章。 分发到相关部门使用,并把旧标准收回。 13 第 4 章 质量管理体系 保定天智电 气有限公司 ,必要 时予以修改,执行 5) 条款规定。