建筑工程设计外文翻译外文文献英文文献公路线形设计内容摘要:
l force also develops gradually. By careful application of superelevation along the spiral, a smooth and gradual application of centrifugal force can be had and the roughness avoided. Easement curves have been used by the railroads for many years, but their adoption by highway agencies has e only recently. This is understandable. Railroad trains must follow the precise alignment of the tracks, and the disfort described here can be avoided only by adopting easement curves. On the other hand, the motorvehicle operator is free to alter his lateral position on the road and can provide his own easement curves by steering into circular curves gradually. However, this weaving within a traffic lane (but sometimes into other lanes) is dangerous. Properly designed easement curves make weaving unnecessary. It is largely for safety reasons, then, that easement curves have been widely adopted by highway agencies. For the same radius circular curve, the addition of easement curves at the ends changes the location of the curve with relation to its tangents。 hence the decision regarding their use should be made before the final location survey. They point of beginning of an ordinary circular curve is usually labeled the PC (point of curve) or BC (beginning of curve). Its end is marked the PT (point of tangent) or EC (end of curve). For curves that include easements, the mon notation is, as stationing increases: TS (tangent to spiral), SC (spiral to circular curve), CS (circular curve to spiral), and ST (spiral go tangent). On twolane pavements provision of a wilder roadway is advisable on sharp curves. This will allow for such factors as (1) the tendency for drivers to shy away from the pavement edge, (2) increased effective transverse vehicle width because the front and rear wheels do not track, and (3) added width because of the slanted position of the front of the vehicle to the roadway centerline. For 24ft roadways, the added width is so small that it can be neglected. Only for 30mph design speeds and curves sharper than 22176。 does the added width reach 2 ft. For narrower pavements, however, widening assumes importance even on fairly flat curves. Remended amounts of and procedures for curve widening are given in Geometric Design for Highways. B Grades The vertical alignment of the roadway and its effect on the safe and economical operation of the motor vehicle constitute one of the most important features of road design. The vertical alignment, which consists of a series of straight lines connected by vertical parabolic or circular curves, is known as the “grade line.” When the grade line is increasing from the horizontal it is known as a “plus grade,” and when it is decreasing from the horizontal it is known as a “minus grade.” In analyzing grade and grade controls, the designer usually studies the effect of change in grade on the centerline profile. In the establishment of a grade, an ideal situation is one in which the cut is balanced against the fill without a great deal of borrow or an excess of cut to be wasted. All hauls should be downhill if possible and not too long. The grade should follow the general terrain and rise and fall in the direction of the existing drainage. In mountainous country the grade may be set to balance e。建筑工程设计外文翻译外文文献英文文献公路线形设计
相关推荐
回填厚度。 (3)基础回填:挖方体积减去设计室外地坪以下埋设的基础体积 (包括基础垫层及其他构筑物 )。 (4)管沟回填:挖土体积减去垫层和直径大于 200mm 的管沟体积。 挖地槽原土回填的工程量,可按地槽挖土工程量乘以系数 计算。 墙体 墙体工程量 : 砖基础与墙身的划分 ,以首层设计室内地坪为界,设计 室内地坪以下为基础,以上为墙身。 如墙身与基础为两种不同材质时,按材质不同处为分界线。
要求 变配电动力系统工程 工程概况 梵宫圣坛动力系统:本工程釆用二路10KV高压供电,其中一路10KV热备用形式供电。 总容量为9200KVA,变电所设在地下室,共二处,分别在梵宫地下和圣坛地下室,在梵宫地下室设高压开关站,高压开关站共有五路高压出线,二路高压供梵宫和圣坛,三路高压供灵山一期、二期原变电所,梵宫内设二台(10KV/)容量为1250KVA变压器
.................................................122 4 电子围栏 ............................................................................................................124 6 案 例实图 ...................
号表示, 文档代下载: ( 元 /篇) 造纸,印染染料请选择 宏浩染料推荐 好文档当选: 而在施工中必须配合相应标准图集才能阅读清楚。 建筑详图应做到图形清晰、尺寸标注齐全、文字注释详尽,建筑详图绘制比例常用 1: 1: 1: 1: 1: 20 等大比例。 二、楼梯详图 楼梯主要由楼梯段、休息平台、栏杆和扶手等组成。 楼梯详图反映了楼梯的布置形式、结构形式以及踏步、栏杆扶手、防滑条等详细构造
上述工程 的施工、竣工和保修。 2.一旦我方中标,我方保证在 ______年 ______月 ______日开工, ______年 _____月 ____日竣工,即 ____天(日历日)内竣工并移交整个工程