检验控制程序(中英文)内容摘要:
ion result in 《 Product Inspection Record》 and determine whether qualified or not。 and put green sticker and red sticker。 green sticker standard for qualified, red sticker stand for unqualified。 判定不合格的进货产品按《不合格品控制程序》执行; Acc. to 《 Unqualified Product Control Procedure》 to deal with the determined unqualified produdt。 产品处理 Product Handling a) 进货检验员在《送检 /入库单》上签字: The ining inspector sign on the 《 Inspect/Warehouse Entry Form》。 b) 将签收的送检单传递给物流部仓库; Transmit the inspection form to the Logistics Department Warehouse。 c) 收集所有的供应商的证明文件,并按产品、日期分类整理。 德信诚 培训网 更多免费资料下载请进: 好好学习社区 Collected all the supplier certificate documents, and classify and sorting acc. to product and date. 进货检验员每周将检验记录和供应商证明文件汇总后,提交质量部资料员登记、归档。 After the ining inspector conclude all the inspection and supplier certification documents every wee, then submit it the QM documenter for registration and archive. 确认检验 Confirm Inspection 对于关键 件、材料应由进货检验员进行定期确认检验,每年应对供应商提供的检验文件如合格 证、质保书及检测报告进行一次确认,确认合格后方可继续供货;如对其有怀疑可进行检验或试验,自己没有能力检测时,可委托第三方进行验证,验证不合格时可允许再次送样进行检验,若再不合格则予以拒收,限期进行整改。 若质量没有改进,取消其供货资格; The key parts and material shall be confirmed and inspected regularly。 shall confirm once a year to the provided docuemnts by the suppliers such as CoC, Quality Gurantee Certificate and test report. Only can continue supply after have confirmed it’s qualified。 If there’s any doubt, can implement inspection and test, when itself has no capability to test, can entrust the third party to validate. It’s allowed to resend the sample to make test after validate it’s unqualified。 If still unqualified shall reject the product and request the supplier to correct winthin requriend period. If there’s no improvement of product quality, can cancel the supplier’s qualification。 德信诚 培训网 更多免费资料下载请进: 好好学习社区 关键件、材料定期确认检验主要是验证其材质的各项性能是否符合相关的材料标准和技术条件、 有关技术文件要求; The main purpose of the regular confirmation inspection of the key parts and material is to validate whether various property of its material meet related material standard and technical condition and requirements of related technical documents。 定期确认检验的结果及采取的措施,进货检验员应记录在《关键件定期确认检验记录》内并保 持; Confirm the inspection result and the implemented action regularly, the ining inspector shall record in to 《 Key Parts Regular Confirmation Inspection Record》 and keep it. 记录并归档关键件定期确认检验记录。 Record and archive the regular inspection records of the key parts。 过程检验 Process Inspection 自检和互检 Selfinspection and Mutual Inspection 车间或生产部在生产开始前对开工条件进行检查和确认,内容包括: The workshop and Production Department check and confirm the start production condition before production, includes the following contents: a) 所领用的原材料规格型号是否符合工艺文件要求; The type and specification of the received material meet the process document requriement or not。 德信诚 培训网 更多免费资料下载请进: 好好学习社区 b) 作业方法是否明确; Whether the operation method is clear or not。 c) 图纸或工艺文件是否受控; Whether the drawing or process documents are under control or not。 d) 设备和工装是否完好; Equipment and tooing in good condition or not。 e) 检具、量具、样板是否在有效期内。 Whether the inspection instrument, measure instruments, sample are in valid period。 检查并确认开工条件满足要求,并在《生产过程质量记录表》首检,互检表上打“√”后再开始生产。 Check and confirm whether the production condition meet the requirement or not, and after mark “√” in the FAI, mutual inspection form of 《 Gangway Production Process Quality Control Form》 then start t。检验控制程序(中英文)
本资源仅提供20页预览,下载后可查看全文
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。
相关推荐
gy铝业公司铝型材加工质量检验标准(10p)
钢卷尺 框架式 177。 横框 0 0 - 附框 0- 0 扣条 0- 0- 端头角度(α) 0 - 6′ 0 - 10′ 角度尺 单头锯下料加工质量标准 3。 表 3 单位: mm 项 目 允许偏差 检验工具 长度尺寸 177。 钢卷尺 端头角度 177。 10′ 角度尺 自动送料切割机质量标准 4。 5 表 4 单位: mm 项 目 允许偏差 检验工具 无配合要求角片 长度尺寸 177。
检测设备校准评定规范09年
查看接地螺钉的规格与框架相接方式;接地线的截面与压接的可靠性等。 绝缘电阻测量 绝缘电阻测量 ,用不小于 500V 的兆欧表进行; 并 检查兆欧表是否处于正常工作状态。 即摇动手柄,使转速 达到每分钟 120 转左右 ,兆欧表在短路时应指在 “0” 位置,开路时应指在 “∞” 位置。 测量前必须将被测设备电源切断 , 被测物表面要清洁,减少接触电阻。 在测量设备的绝缘电阻时,应使 兆欧表 的