pdu安装使用手册-ele-b2bcom内容摘要:

Yellow light, When disabled, means the absence of earth wire of the power supply system, which shall be the case to contact an electrician for his professional check and grounding. 黄灯灭,则表明您的供电系统无接地线,此时应请专业电工检查供电线路,并连接好接地线,直至黄灯亮; B. Red light. When working, means that Filter output power. 当红灯亮时,说明有过滤的电源输出。 C. Green light, when disabled, means the failure of the lightning protection circuit. 绿灯灭时,则表明本产品的防雷保护电路失效。 2. When the PDU with TURNLINK A20C2+ module 电源分配单元系统配置有 TURNLINK A20C2+时: When the green LED indicator lights, the surge protection function of this unit is normal。 If not, the surge protection function of this unit is 4 invalidation, here need you draw out the surge protection module, and plug in a new one, the surge protection function will e back. 其 绿色 LED 指示灯亮时,则表明本产品的防雷保护功能正常;反之,则表明防雷功能已失效,此时应将该防雷模块用力拔出,再插入一新的防雷模块,以保证其防雷功能的正常工作。 3. When equipped with a fastfused protective system 电源分配单元系统配置快速熔断保险丝保护装置时: When a fuse is blew out without power output, disconnect the connected equipment from the power supply, turn the screw on the overload protective device in a countclockwise direction and remove the fuse. Use a new fuse in the protective device, turn the screw in a clockwise direction. A tight securing of the screw ensure a normal operation. 配置 快速熔断保险丝时:若保险丝熔断无电源输出时,请先将连接的设备的电源开关关断,再将过载保护装置上的旋钮逆时针方向旋出,取出已熔断失效的保险丝管,待故障排除后,再换上新的同规格的保险丝管,装入过载保护装置内并顺时针旋紧即可正常通电使用; 4. When equipped with an overload automatic protective swith: 电源分配单元系统配置过载自动保护开关保护装置时: A disconnected switch shall be the case to disconnect the connected equipment. A push on the reset button on the switch when failures are eliminated ensures a normal operation. 配置过载自动保护开关时:若过载自动保护开关跳开时,请先将连接的设备的电。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。