课程:功能性高分子授课老师:谢庆东学生:魏伯翰学号:内容摘要:

heological characterization2 Fig. 4. Mechanical spectra of Pol1 at 25 176。 C (A) and 43 176。 C (B). Results are the means of three measurements. SD was always lower than 10% G ′及黏性模數 G 〞 在 25℃ 及 43℃ 剪切頻率~1的範圍下, Pol1會產生什麼樣的變化,由 Pol1的成膠溫度為 37 ℃ ,由 (A)可看出在 25 ℃ 、剪切頻率 ~1的條件下 , G 〞 > G ′,由此篇文章定義來說這是未成膠的狀態 ,而在 43 ℃ 、剪切頻率 ~1的條件下, G 〞 < G ′,文章定義此為成膠狀態 ,此結果呼應了前面 Pol1在過了 37 ℃ 後會是成膠的狀態。 Rheological characterization3 Fig. 5. Elastic modulus as a function of frequency of Pol1 containing different amount of HA at 43 ℃ . Results are the mean of three measurements. SD was always lower than 10%. Error bars are omitted for clarity purpose. Photon correlation spectroscopy Table 2 Hydrodynamic diameters, elastic and viscous moduli values (at Hz and 43 ℃ ) of Pol1 containing %, %, 1% and 2% w/w of HA Results are the means of three measurements. SD was always lower than 10%. G ′、黏性模數 G 〞 和流體動力學直徑 (HD)的大小,由大而小分別是 Pol1/H Pol1/H Pol1/H0 Pol1/H0 Pol1,由此數據來決定 Pol1/H2具有較佳的生物黏附性。 Mucoadhesion analysis1 Fig. 6. Flow curves of mucin dispersion at 15% w/w (M), Pol1/H2 and their mix。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。