中国民航航空器适航审定系统的建设developmentofaircraft内容摘要:
发达的民族航空制造业;以及 having developed Chinese aviation manufacturing industry, and 建成与其相应的适航审定系统 have updated airworthiness certification system adaptive to the aviation industry “ 适航先行 ” 的理念 The concept of “airworthiness petitiveness” 历史机遇和挑战 Chance and Challenge 在 2020年中国民航发展论坛上,前任民航总局局长杨元元在其《中国发展新一代民用航空运输系统的愿景》的主题演讲中,明确提出要 “ 建立适应国际新技术、新标准、新程序的适航审定系统 ” In the 2020 China Civil Aviation Development Forum, Mr. Yang Yuanyuan, the former minister of CAAC, gave the concept of “establish airworthiness certification systems which are adaptive to new international technology, new standards, and new procedures” in his speech “Vision of a New Generation Air Transport System in China” 民航局李家祥局长明确要求,适航审定系统对民族航空制造业要 “ 大力支持,适合航行 ” Mr. Li Jiaxiang, administrator of CAAC gave the further explanation and requirement on how the airworthiness certification system provides support to the Chinese aviation industry, as the concept of “provide support and ensure airworthiness” 历史机遇和挑战 Chance and Challenge 小结 Summary 民航大国向民航强国转变的需要 To meet the strategic transform from large aviation industry into strong one 发展新一代民用航空运输系统 To meet the vision of a New Generation Air Transport System in China “适航先行 ” 的概念 The concept of “airworthiness petitiveness” “大力支持,适合航行 ” 的概念 The concept of “provide support and ensure airworthiness” 提纲 OUTLINE 中国民航适航审定系统的历史、现在与未来 History, Present and Future of the Airworthiness Certification System of CAAC 中国民航适航审定系统建设的历史机遇和挑战 Chance and Challenge to Development of the Airworthiness Certification System of CAAC 中国民航适航审定系统建设的关键要素和战略框架 Key Elements and Strategic Framework of the Airworthiness Certification System。中国民航航空器适航审定系统的建设developmentofaircraft
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。