出国留学申请之简历范文内容摘要:

ENDED AREAS OF STUDY: Algorithm Analysis, Complexity Theory, Parallel Algorithms and Interconnection Network, Crytography and Data Security, Al, Database System PUBLICATIONS: 1. “Techniques in Distribution and Management of Database Encrytion keys”, Proceedings of 3rd Annual Symposium on Computer Imformation Security, Chinese Computer Federation, 1992 2. “Key Transformation through Transformation Table”, Proceedings of 3rd Annual Symposium on Computer Imformation Security, Chinese Computer Federation,1992 HONORS: 1. Tsinghua University Scholarship 19861991, First Prize 2. Lin Jiaqiao (Professor of MIT) Applied Mathematics Scholarship 1988 (10 students awarded over 15,000 students of Tsinghua University) 3. “Computer World” Scholarship 1990 (one of 60 students all over . China) 4. Guang Hua Scholarship for Graduate Students 1992, First Prize SPORTS: Soccer, Captain of Tsinghua University Soccer Team and Champion of League A of Beijing Universities and Colleges 1992. STANDARD TESTS: TOEFL: 64/68/61 total 643, May 1996 GRE General: 610,82%/800,97%/790, 98%, Oct, 1996. Subject (on Computer Science): 790,93%, Oct. 1992 范文 3 RESUME Name: Wang Yifang Sex: Male Birth: 28/6/1965, Beijing P. R. China Major: Computer Software 1. Courses Studied: Mathematical Analysis Introduction to Database System Advanced Algebra Softw。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。