土木工程毕业论文外文翻译---建筑施工混凝土裂缝的预防与处理-建筑结构(编辑修改稿)内容摘要:
onstruction be difference in temperature variety more big, perhaps is a concrete to be subjected to assault of cold wave etc., will cause concrete surface the temperature sharply descend, but creation constringency, surface constringency of the concrete be subjected to inner part concrete of control, creation very big of pull should dint but creation crack, this kind of crack usually just in more shallow scope of the concrete surface creation. The alignment of the temperature crack usually none settle regulation, big area structure the crack often maneuver interleave。 The size bigger structure of the beam plank length, the crack run parallel with short side more。 Thorough with pierce through sex of temperature crack general and short side direction parallelism or close parallelism, crack along long side cent the segment appear, in the center more width the size be different, be subjected to temperature variety influence more obvious, winter pare breadth, summer more concrete temperature crack that the heat inflation cause is usually in the center the thick both ends be thin, but cold Suo crack of thick thin variety not too emergence of the this kind crack will cause the rust eclipse of reinforcing bar, the carbonization of concrete, the anti jelly which lower concrete melt, anti tired and anti Shen ability etc.. Main prevention measure:One is as far as possible choose to use low hot or medium hot water mire, like mineral residue cement, powder ash from stove cement...etc..Two is a decrease cement dosage, cement dosage as far as possible the control is in the 450 kg/m 3 is to lower water ash ratio, water ash of the general concrete ratio control below is improvement the bone anticipate class to go together with, the Chan add powder ash from stove or efficiently reduce water etc. to e to reduce cement dosage and lower water to turn is an improvement concrete of mix blend to process a craft, lower sprinkle of concrete to build is the in addition that the Chan add a have of fixed amount to reduce water and increase Su, slow Ning etc. function in the concrete, improvement the concrete mix to match a thing of mobility, protect water, lower water to turn hot, postpone hot Feng of emergence is the heat season sprinkle to build can the adoption take to establish to hide sun plank etc. assistance measure control concrete of Wen Sheng, lower to sprinkle temperature of build the is the temperature of big physical volume concrete should the dint relate to structure size, concrete structure size more big, temperature should dint more big, so want reasonable arrangement construction work preface, layering, cent the piece sprinkle to build, for the convenience of in spread hot, let up is at great inner part constitution of the physical volume concrete cool off piping, cold water perhaps cold air cool off, let up concrete of inside outside difference in is the supervision which strengthen concrete temperature, adopt to cool off in time, protection is to reserve temperature constringency to is to let up to control, sprinkle proper before building concrete in the Ji rock and old concrete top build a 5 mm or so sand mat a layer or usage asphalt etc. material Tu2 is to strengthen concrete to protect, the concrete after sprinkle build use moist grass Lian in time, hemp slice39。 s etc. overlay, and attention sprinkle water to protect, appropriate extension protect time, assurance the concrete surface be slowmoving cool the cold season, concrete surface should constitution heat preservation measure, in order to prevent cold wave is the allocation be a little amount in the concrete of reinforcing bar perhaps add fiber material concrete of temperature crack control at certain of scope inside. and prevention that the chemical reaction cause Alkali bone39。 s anticipating the crack that reaction crack and reinforcing bar rust eclipse cause is the most familiar in the reinforced concrete structure of because of chemical reaction but cause of crack. The concrete blend a future reunion creation some alkalescence ion, these ion with some activity the bone anticipate creation chemical reaction and absorb surroundings environment in of water but the physical volume enlarge, make concrete crisp loose, inflation open this kind of crack general emergence concrete structure usage period, once appear very difficult remediable, so should at under construction adopt valid the measure carry on of prevention measure:While being to choose to anticipate with the alkali activity small freestone is the in addition which choose to use low lye mire with low alkali or have no is the Chan which choose to use acmodation with anticipate to repress an alkali bone to anticipate reaction. Because the concrete sprinkle to build, flap Dao bad perhaps is a reinforcing bar protection layer thinner, the harmful material get into concrete to make reinforcing bar creation rust eclipse, the reinforcing bar physical volume of the rust eclipse inflation, cause concrete bulge crack, the crack of this kind type much is a crack lengthways, follow the position of reinforcing bar of prevent measure from have:One is assurance reinforcing bar protection the thickness of the is a concrete class to go together with to want is a concrete to sprinkle to note and flap Dao airtig。土木工程毕业论文外文翻译---建筑施工混凝土裂缝的预防与处理-建筑结构(编辑修改稿)
相关推荐
ing the economy , And other disciplines and construction technology, construction and other fields of knowledge, as well as puter and mechanical testing techniques. Civil engineering is therefore a
s, dynamic paction, cement and fly ash gravel piles, DJM France. The dynamic paction method can be used to hammer paction or dynamic paction: sand foundation and the water content in a range of soft
imulation and optimization The application of CFD simulation in the indoor environment is based on conversation equations of energy, mass and momentum of inpressible air. The study adopted a
电风扇,以免造成称量不准或细颗粒损失; 在操作过程中,如发现仪器异常,应立即关机。 并查明原因; 试验完毕,应将所使用的仪器擦干净,配件放回原处,较精密的仪器应放入 柜内或套上防尘罩,试验废料当日清理; 下班前,应检查门、窗、水、电; 认真执行《试验室管理制度》。 (二) 集料室工作制度 每日上班应对本室的仪器设备、工具、水、电进行检查。 如有异常情况应立即采取措施;
nsverse live loads, seismic loads, and wind loads are proportionally distributed to the towers and the piers by the fixity of the deck to the towers and by reinforcedconcrete shear keys located at
portionally distributed to the towers and the piers by the fixity of the deck to the towers and by reinforcedconcrete shear keys located at the top of P1, P3, and P4. The deck is allowed to move