建筑工程技术规范英文版technicalspecifications(编辑修改稿)内容摘要:

522 PROTECTION AND MAINTENANCE 523 ROAD TRAFFIC MARKING 524 SCOPE 524 MATERIALS 524 WEATHER LIMITATIONS 524 MECHANICAL EQUIPMENT FOR PAINTING 524 SURFACE PREPARATION 525 SETTING OUT OF ROAD TRAFFIC MARKINGS 525 APPLICATION OF PAINT 525 TOLERANCE REQUIREMENTS 526 GENERAL 526 FAULTY WORKMANSHIP OR MATERIALS 527 PROTECTION 527 SPEED BUMPS AND RUMBLE STRIPS 528 SCOPE 528 MATERIALS 528 CONSTRUCTION AND INSTALLATION 528 GUIDE POSTS AND KMMARKER POSTS 529 SCOPE 529 MATERIALS 529 MANUFACTURING 529 LOCATION AND SPACING OF GUIDE POSTS AND KMMARKER POSTS 529 ERECTION 529 STEEL GUARDRAIL AND MASONRY SAFETY BARRIER 530 SCOPE 530 MATERIALS 530 CONSTRUCTION 531 LANDSCAPING AND GRASSING 533 SCOPE 533 MATERIALS 533 LANDSCAPING OF AREAS 534 PREPARATION OF AREAS FOR GRASSING 535 GRASSING 535 ESTABLISHMENT AND MAINTENANCE OF THE GRASS 536 GENERAL 537 FINISHING OF ROAD, RIGHTOFWAY, AND OTHER AREAS WITHIN THE SITE BOUNDARY 538 Ethiopian Roads Authority Adigrat Adwa Shire Road Upgrading Project Contract Number 1 – Shire to Adi Abun Bidding Documents Section VI – Technical Specifications Page ix March 2020 SCOPE 538 FINISHING OF ROAD, RIGHTOFWAY AND OTHER AREAS WITHIN THE SITE BOUNDARY 538 TREATMENT OF OLD ROADS AND CONTRACTOR‟S HAUL ROADS 538 MEASUREMENT AND PAYMENT 538 RIPRAP 539 SCOPE 539 MATERIAL REQUIREMENTS 539 CONSTRUCTION REQUIREMENTS 540 REINSTATEMENT OF IRRIGATION WORKS 542 SCOPE 542 IRRIGATION WORKS 542 6 TESTING 61 GENERAL 61 COST OF TESTING 61 TAKING AND SUBMISSION OF SAMPLES 61 TESTING OF AGGREGATES 62 TESTING OF CONCRETE 62 TESTING EQUIPMENT 62 STORAGE, DISPATCH AND TESTING OF SAMPLES 63 TESTS RELATING TO CHEMICAL STABILISATION 63 TESTING OF CEMENT 63 TESTING OF BITUMEN AND BITUMINOUS PRODUCTS 64 TESTING OF PAVEMENT SURFACE CHARACTERISTICS 64 STRAIGHTEDGE TEST FOR SURFACE IRREGULARITIES ON SURFACES HAVING COURSE TEXTURE 64 ROLLING STRAIGHTEDGE FOR MEASURING ASPHALT SURFACE IRREGULARITIES 64 SURFACE TEXTURE BY USE OF THE SAND PATCH METHOD 65 QUALITY CONTROL 66 LABORATORY TRIALS 66 SITE TRIALS 66 JUDGEMENT SCHEMES GENERAL 67 CONTROL METHOD TYPE A, STATISTICAL CONTROL 68 CONTROL METHOD TYPE B 611 SAMPLING CRITERIA 612 OUTLINE TESTING AND INSPECTION BY THE ENGINEER 612 SAMPLING AND TESTING OF SOILS AND GRAVELS 613 SAMPLING AND TESTING OF STONES, AGGREGATES, SANDS AND FILLERS 614 CEMENT 615 Ethiopian Roads Authority Adigrat Adwa Shire Road Upgrading Project Contract Number 1 – Shire to Adi Abun Bidding Documents Section VI – Technical Specifications Page x March 2020 LIME 616 CEMENT OR LIME TREATED MATERIALS 616 CONCRETE 616 BITUMINOUS BINDERS 616 BITUMINOUS MIXES 618 SAMPLING AND TESTING EQUIPMENT 619 SAMPLING AND TESTING FREQUENCIES 619 STANDARDS TO BE AVAILABLE 619 Ethiopian Roads Authority Adigrat Adwa Shire Road Upgrading Project Contract Number 1 – Shire to Adi Abun Bidding Documents Section VI – Technical Specifications Page 11 March 2020 1 GENERAL PROVISIONS FORMAT AND REFERENCING FORMAT OF THE SPECIFICATIONS These Technical Specifications are divided into six parts. Each part is designated by a single digit followed by a title as follows: Part 1: General Provisions Part 2: Earthworks, Subbase, Base and Shoulders Part 3: Bituminous Construction Part 4: Concrete, Steel and Structures Part 5: Ancillary Works Part 6: Testing Each part is divided into Sections designated by the Part number, a decimal point and a sequential number followed by a title. Each section is divided into Subsections. Each Subsection is designated by the Part number, a decimal point, the Section number, a decimal point and a sequential number followed by a title. Each Subsection may have been divided into Clauses designated (a), (b), (c), etc. and each Clause may have been divided into Subclauses designated (i), (ii), (iii), (iv), etc. REFERENCING The Specifications for Pay Items in the Bill of Quantities are prescribed in the respective Section(s) corresponding to the type of Works involved. Specifications and Drawings may contain crossreferences to other Sections, Subsections, Clauses or Subclauses which shall likewise be construed as Specifications for the Item of Work involved. The Specifications is to be applied for the entire AdigratAdwaShire Road Upgrading Project which is divided into two lots. Specifications for work or materials not required in a particular Lot, will be deemed not to apply for that Lot. Ethiopian Roads Authority Adigrat Adwa Shire Road Upgrading Project Contract Number 1 – Shire to Adi Abun Bidding Documents Section VI – Technical Specifications Page 12 March 2020 DEFINITIONS, TERMS AND ABBREVIATIONS DEFINITIONS AND TERMS In these Specifications the following terms, words or expressions shall have the meanings hereby assigned to them except where the context otherwise requires. ACCEPTED Accepted in writing by the Engineer (or by the Employer where appropriate) as meeting the requirements of the Contract Documents and of any authorised variations thereto. “Acceptance” means accepted in writing as aforesaid. “Acceptable” means acceptable to the Engineer as aforesaid. Any acceptance and/or approval of the Engineer or his representatives is given subject to the provisions of SubClause of the Conditions of Contract. ADDENDUM Amendment of or revision to any of the Contract Documents issued to Tenderers, and which is deemed to form part of the Contract Documents. AGGREGATE Crushed stone of specified size and quality to be applied as levelling or base course material or to be used in asphalt concrete, chippi。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。