20xx最新10月ccna题库word版201~300题(编辑修改稿)内容摘要:
rip R1(configrouter) version 2 R1(configrouter) work QUESTION 240 A work administrator wants to ensure that only the server can connect to port Fa0/1 on a Catalyst switch. The server is plugged into the switch Fa0/1 port and the work administrator is about to bring the server online. What can the administrator do to ensure that only the MAC address of the server is allowed by switch port Fa0/1? (Choose two.) A. Configure port Fa0/1 to accept connections only from the static IP address of the server. B. Employ a proprietary connector type on Fa0/1 that is inpatible with other host connectors. C. Configure the MAC address of the server as a static entry associated with port Fa0/1. D. Bind the IP address of the server to its MAC address on the switch to prevent other hosts from spoofing the server IP address. E. Configure port security on Fa0/1 to reject traffic with a source MAC address other than that of the server. F. Configure an access list on the switch to deny server traffic from entering any port other than Fa0/1. QUESTION 241 The interwork infrastructure of pany XYZ consists of a single OSPF area as shown in the graphic. There is concern that a lack of router resources is impeding interwork performance. As part of examining the router resources, the OSPF DRs need to be known. All the router OSPF priorities are at the default and the router IDs are shown with each router. Which routers are likely to have been elected as DR? (Choose two.) A. Corp1 B. Corp2 C. Corp3 D. Corp4 E. Branch1 F. Branch2 QUESTION 242 At which layers of the OSI model do WANs operate? (Choose two.) A. application layer B. session layer C. transport layer D. work layer E. datalink layer F. physical layer QUESTION 243 Which routing protocols can be used within the enterprise work shown in the diagram? (Choose three.) A. RIP v1 B. RIP v2 C. IGRP D. OSPF E. BGP F. EIGRP QUESTION 244 Refer to the graphic. R1 is unable to establish an OSPF neighbor relationship with R3. What are possible reasons for this problem? (Choose two.) A. All of the routers need to be configured for backbone Area 1. B. R1 and R2 are the DR and BDR, so OSPF will not establish neighbor adjacency with R3. C. A static route has been configured from R1 to R3 and prevents the neighbor adjacency from being established. D. The hello and dead interval timers are not set to the same values on R1 and R3. E. EIGRP is also configured on these routers with a lower administrative distance. F. R1 and R3 are configured in different areas. QUESTION 245 Which statements are true about EIGRP successor routes? (Choose two.) A. A successor route is used by EIGRP to forward traffic to a destination. B. Successor routes are saved in the topology table to be used if the primary route fails. C. Successor routes are flagged as active in the routing table. D. A successor route may be backed up by a feasible successor route. E. Successor routes are stored in the neighbor table following the discovery process. QUESTION 246 CCNA考试报名 1700元 112 艾迪飞论坛 to the diagram. All hosts have connectivity with one another. Which statements describe the addressing scheme that is in use in the work? (Choose three.) A. The sub mask in use is . B. The sub mask in use is . C. The IP address can be assigned to hosts in VLAN1 D. The IP address can be assigned to hosts in VLAN1 E. The LAN interface of the router is configured with one IP address. F. The LAN interface of the router is configured with multiple IP addresses. QUESTION 247 Refer to the diagram. Which three statements describe the router port configuration and the switch port configuration as shown in the topology? (Choose three.) A. The Router1 WAN port is configured as a trunking port. B. The Router1 port connected to Switch1 is configured using subinterfaces. C. The Router1 port connected to Switch1 is configured as 10 Mbps. D. The Switch1 port connected to Router1 is configured as a trunking port. E. The Switch1 port connected to Host B is configured as an access port. F. The Switch1 port connected to Hub1 is configured as full duplex. QUESTION 248 Which routing protocols will support the following IP addressing scheme? (Choose three.) Network 1 /26 Network 2 /27 Network 3 /27 Network 4 /30 Network 5 /30 A. RIP version 1 B. RIP version 2 C. IGRP D. EIGRP E. OSPF QUESTION 249 Refer to the partial mand output shown. Which two statements are correct regarding the router hardware? (Choose two.) A. Total RAM size is 32 KB. B. Total RAM size is 16384 KB (16 MB). C. Total RAM size is 65536 KB (64 MB). D. Flash size is 32 KB. E. Flash size is 16384 KB (16 MB). F. Flash size is 65536 KB (64 MB) QUESTION 250 The Ether works connected to router R1 in the graphic have been summarized for router R2 as , according to this summary? (Choose two.) A. B. C. D. E. F. QUESTION 251 The show interfaces serial 0/0 mand resulted in the output shown in the graphic. What are possible causes for this interface status? (Choose three.) A. The interface is shut down. B. No keepalive messages are received. C. The clockrate is not set. D. No loopback address is set. E. No cable is attached to the interface. F. There is a mismatch in the encapsulation type. QUESTION 252 Which of the following describe private IP addresses? (Choose two.) A. addresses chosen by a pany to municate with the Inter B. addresses that cannot be routed through the public Inter C. addresses that can be routed through the public Inter D. a scheme to conserve public addresses E. addresses licensed to enterprises or ISPs by an Inter registry anization QUESTION 253 Re。20xx最新10月ccna题库word版201~300题(编辑修改稿)
相关推荐
其所而又和谐相处的局面,为改革开放和社会主义现代化建设营造良好社会环境。 17 国家公务员考试申论热点:低碳经济 【背景链接】 随着全球人口和经济规模的不断增长,能源使用带来的环境问题及其诱因不断地为人们所认识,人类对经济发展方式有了更深刻的认识, “ 低碳经济 ” 、 “ 低碳生活方式 ” 、 “ 低碳社会 ” 等一系列新概念、新政策应运而生。 能源与经济以至价值观实行的大变革将引导人们摒弃
10 have been entered in the shown order and app。 ied to interface E0 inbound,to prevent all hosts(except those whose addresses are the first and last IP of sub ) from accessing the as is,the ACL dose
ok place, was typical avalanche material. … 52. According to the writer, skiing conditions in the Salzburg area of Austria before the accident happened were ___. A. perfect for the inexperienced
腔各平面中心点的假想轴线,呈弯曲弓状线 49.为念珠菌性阴道炎病人作阴道灌洗,宜选择的药液是 (E) A.生理盐水 B. 1: 5 000 高锰酸钾 C. 0. 5%醋酸 D. 1%乳酸 E. 2%~ 4%碳酸氢钠 50.葡萄胎患者随访期间,宜选用避孕方式是 (A) A.阴茎套 B.放置宫内节育器 C.避孕药 D.安全期 E.体外排精 51.关于子宫肌瘤,正确说法是 (E)
、合同复印件、发票复印件、活动记录表等 巡展照片:彩印成册且有日期,能看到各站点明显建筑物; 巡展发票复印件:各站点路油费发票复印件至少两张,日期清晰; 网络类 发布网站、合同复印件、网页样稿等 / 其他类 自制广宣品照片、自制广宣品样品、制作合同复印 件、发票复印件等 自制广宣品照片:能看到总体数量的照片 《广宣管理手册》 2020 年版 10 广宣资料汇总表( 2020 年第 季度 ) 编号
下,“共车”不仅节约钱,减轻大城市交通压力,还可以到处旅游。 51. A. 根据上下文知道“共车”在许多国家受欢迎。 52. C. 车是被停在车库。 53. B. 长达一、两小时 54. A. other 作定语修饰名词复数。 55. B. “享车”当然是为了节约钱。 56. C. spend 常常与 on sth 或 doing sth 连用。 Cost 的主语是物而不是人。 57. A.