水泥专业外文翻译---立式辊磨机(编辑修改稿)内容摘要:
cementthe layout is prepared with provisions for r ecirculation of hot exit gas to the mill inlet. In case the mill feed is wet slag or includes a significant portion of wet additives, addition heat must be provided, for inentance form a heat generator. Otherwise, if the mill feed is very hot, the mill exit temperature controls a damper for cold air intake. Nozzle ring bypass system For slag grinding, a specially designed nozzle ring bypass allow the iron particles to segregate through nozzles without airflow and subsequently be removed by a magic separ ator to minimise — 4— wear of the mill internals. One mill, many products The OK mill efficiently grinds blended cements, with a wide range of additives such as slag puzzolana, limestone and fly ash. Its versatility is demonstrated by the ability to switch bet ween a wide variety of mixes, and to vary the particle size to meet individual needs. Particle size distribution Example of adjustment of particle sizedistribution when grinding to the sameBlaine surface. The required steepness of the particle size distribution curve is attained by sdjustment of the separatorrotor speed, the mill airflow rate and the grinding pressure, in bination with the appropriate height of the dam ring. Optimisation of operation Adjustment of mill airflow and grinding pressure for optimisation of the operatinon, including adjust。水泥专业外文翻译---立式辊磨机(编辑修改稿)
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。