中心医院住院部大楼设计_土木工程结构专业毕业设计计算书(编辑修改稿)内容摘要:

................................ 65 (抗规 ) ........................................................................................ 65 .......................................................................................................................... 66 . 1静力荷载作用下位移 ............................................................................................................... 66 ......................................................................................................................... 69 .................................................................................................................................. 71 ................................................................................................................. 71 ................................................................................................................. 86 土木工程毕业设计总结 ........................................................................................................................................... 96 致 谢 .......................................................................................................................................................................... 98 参考文献 .................................................................................................................................................................... 99 2020届土木工程(建筑结构工程)毕业设计(论文) I 摘 要 毕业设计是培养学生综合运用所学的基础理论、基本知识和基本技能,分 析和解决实际问题的能力。 它具有很强实践性和综合性,是培养学生独立工作的一种良好途径和方法。 在设计过程中,我重温和巩固了以前所学的基础理论和专业技术知识,弥补了自身在这些方面的欠缺,同时更深刻地体会到了作为一名 房建 工作者无论是在设计还是在施工过程中,都必须以科学严谨的态度将理论与实践切实联系起来。 在设计中,我翻阅了大量的参考资料,努力使所学的知识不断地系统化,不断地融会贯通。 本次毕业设计题目为中心医院住院部大楼设计。 设计内容包括建筑设计、结构设计。 本设计主体为六层,底层高为 米,其余层高为 米 ,总建筑面积近为 6000平方米,室内外高差为 米,本工程设定相对标高177。 功能上满足住院部大楼的使用要求,能够充分的利用有限的空间使布局更加合理。 本工程采用钢筋混凝土框架结构,建筑抗震设防烈度为 7 度,基础采用柱下独立基础。 结构计算包括手算和电算两部分,其中手算部分包括:一榀框架的结构计算,框架柱下基础的计算。 电算部分采用广厦 CAD 结构设计软件进行分析计算。 通过毕业设计,综合应用四年的所学的专业知识,使我的专业水平得到很大提高,为将来的工作打下了坚实的基础。 关键词 : 内力组合,构件设计 ***:中心医院住院部大楼设计 II ABSTRACT Graduation is to train students integrated use of the basic theory, basic knowledge and basic skills to analyze and solve practical problems. It has a strong practical and prehensive, is to train students to work independently as a good approach and methodology. In the design process, I revisit and consolidate what they have learned on the basis of the previous theoretical and technical expertise in these areas to make up for the lack of its own, but also insight into the bridge as a worker in either the design or in the construction process must be based on rigorous scientific approach to linking theory and practice effectively. In the design, I read a lot of reference materials, and strive to make their knowledge constantly systematic, continuous mastery. The graduation project titled Central Hospital inpatient building designs. Design elements include architectural design, structural design. The design of the main body of six, bottom height of m, and the remaining storey of meters, a total construction area of nearly 6,000 square meters of indoor and outdoor height of meters, the project set the relative elevation 177。 . Functionality to meet the requirements for use in inpatient building, can take full advantage of the limited space to make the layout more reasonable. This project uses reinforced concrete frame structure, building seismic intensity of 7 degrees, the foundation uses independent foundation under column. Structural calculations including hand calculations and Computing two parts, one hand calculation section includes: abay frame structure calculation, a calculation based on the framework of the next column. Computer part adopts mansions CAD design software for analysis calculations. By graduation, a fouryear prehensive application expertise have learned to make my professional level has been greatly improved for future work to lay a solid foundation. 2020届土木工程(建筑结构工程)毕业设计(论文) III KEY WORDS: architectural design, load ltatistics, bined forces, ponent design ***:中心医院住院部大楼设计 IV 前 言 毕业设计是大学本科教育 培养目标实现的重要阶段,是毕业前的综合学习阶段 ,是深化、拓宽、综合教和学的重要过程 ,是对大学期间所学专业知识的全面总结。 本次毕业设计所选题目是:中心医院住院部大楼设计, 要求设计的建筑面积为 :8000 ㎡ 左右,建筑主体为 6层 , 拟采用钢筋混凝土框架结构,设计耐久年限是 50年,抗震设防等级为 7级。 本课题的设计将分为建筑设计、结构设计及毕业设计整理六个方面。 建筑设计分为初步设计及施工图设计两个阶段,在此阶段将拟定建筑方案,确定建筑使用的材料及做法,确定建筑的总体形状及各种尺寸,绘出平、立、剖、总平面图、详图、写 出施工说明并列出门窗明细表;结构设计部分包括计算确定荷载,同时进行荷载分析、内力计算,进行最终结构图的绘制;毕业设计整理阶段完成对给定的英文文献的翻译工作,按学校毕业设计条例及教研室实施细则整理毕业设计成果,做好毕业答辩准备工作。 设计全过程将充分考虑安全、经济、适用三要素,建筑设计注意与周围环境的协调,功能区组合合理。 考虑建筑自身特点,着力体现出现代化医院既实用又美观大方的形象特点。 结构设计要求结构布置合理,构件设计经济合理。 具体设计内容、施工工艺等将按照规范在施工说明及各式设计图中详细体现。 毕业设计三 个多月的时间里,在指导老师的帮助下,经过资料查阅、设计计算,加深了对新规范、规程、手册等相关内容的理解。 巩固了专业知识、提高了综合分析、解决问题的能力。 由于自己水平有限,难免有不妥和疏忽之处,敬请各位老师批评指正。 二零一三年六月十日 2020届土木工程(建筑结构工程)毕业设计(论文) 1 第一章 建筑设计 设计资料 建筑地点 住院部大楼 位于市区,该区域交通便利,商业繁华, 地面粗糙度为 C 类。 建筑技术条件 地形概况 拟建 工程位于 市 区, 地形较 平坦, 地质情况较为简单,无不良地质现象。 气象条件 基本风压 ,常年无积雪。 水文地质条件 场地地下水及土层对砼、砼内钢筋及钢结构等无腐蚀性。 地震效应评价及地基岩土承载力特征值建议值 该场地抗震设防烈度为 7度,设计地震分组为第一组,该场地设计基本地震加速度值为 ,建筑场地类别为Ⅱ类。 地基土承载力特征值建议值(见表 1): 表 1:建筑地层一览表 (标准值 ) 序 号 岩 土 分 类 土 层 深 度 (M) 厚 度 范 围 (M) 地基承载力 fk (kpa) 桩 端 阻力qp(kpa) 桩周摩 擦 力 qs(kpa) 1 杂填土 2 粉 土 — 120 10 3 中 砂 200 25 4 砾 砂 — 300 2400 30 5 圆 砾 — 500 3500 60 注:1)地下稳定水位距地坪- 8 M 以下; 2)表中给定土层深度由自然地坪算起。 建筑特点 中心医院住院部大楼设计 ,该住院部大楼每层建筑面积 1000 平方米,层数 6层,设计使用年限 50 年。 住院部大楼应包括病房(含单间、双人间、多人间等,其中双人***:中心医院住院部大楼设计 2 间最多),护士站(含护士工作区,配药间),开水房,医生办公室,重症监护室,库房等。 住院部大楼底楼通常设有咨询台、缴费处及出入院手续办理、分药房、洗衣房等。 各房间大小参见相关规范及实际调研确定。 2020届土木工程(建筑结构工程)毕业设计(论文) 3 第 二 章 结构设计 设计资料 设计标高:室内设计标高  ,室内外高差 200mm。 墙身做法。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。