某家用电器公司1101检验测量和试验设备控制程序(编辑修改稿)内容摘要:

the IMTE can39。 t be traced in the national standard, a selfcalibration method will be piled by the Engineering Department as the technical documents for calibration . 经检定的检测设备,由相应的计量部门发给检定证书,并由质量部在检测设备上标以合格、停用、准用、报废等状态标识, 并填写《检测设备履历卡》 The calibrated IMTE shall be issued with Authentication Certificate by corresponding measurement authority. Meanwhile, the Quality Department shall attach status labels onto the IMTE, . acceptable, suspension, admissible, or scrap, and fill in the IMTE Record Card. 质量部保存检测设备的检定和校准记录,及检测设备的其他档案。 The Quality Department will keep the inspection and calibration records of the IMTE, and other files. 使用和维护 Operation and Maintenance 检测设备使用人员正确使用和维护检测设备,做好日常的维护保养工作,使设备处于完好状态。 All users should operate the IMTE correctly and be responsible for the daily maintenance to make the equipment stay in good order. 发现检测设备偏离校准状态时,应停止使用,并通知质量部对检测过的产品、项目重新评定其有效性,并采取相应的纠正措施,追溯到不合格的产品按《不合格品控制程序》执行。 When the IMTE is found of deviation off the calibration, it should be suspended from using. The Quality Department should be informed to reevaluate the effectiveness of the inspected products and items, and meanwhile conduct corrective actions. To trace the unacceptable product, follow the “Nonconforming Product Control Procedures”. 检测设备的使用环境应满足测量要 求。 The operating environment of the IMTE should meet the measurement requirements. 检测设备的搬运、防护和贮存期间防止冲击、碰撞等损伤应严格按使用说明规定执行,使其准确度和适用性保持完好,使用前检查其校准状态是否完好,并防止因调整不当而使其准确度失效。 In handling, preservation and storage process, the IMTE must be prevented from shock and bumps. Follow the operation instructions and ensure the IMTE in good precision and applicability. Before use, check the calibration status of the IMTE and prevent precision failure due to improper adjustment. 准用和报废 Admission and Scrap 检测设备经维修后达不到合格标准,但仍能满足测量要求,经管理者代表同意后可准用,达不到测量要求时。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。