牛津译林版高中英语必修二unit1talesoftheunexplainedperiod2教案内容摘要:

在本句中 witness 词性为 ,含义是。 如: I was a witness to their quarrel. 另外, witness 还可用作 (词性),含义是。 如: Who witnessed the accident。 此句中 saw Justin walking 是 ______________(结构 ) 【 拓展 】 see +sb./sth. + _______________________小试牛刀。 1) 我看见他进了那家饭店。 I into the restaurant. 2)看到儿子在托儿所受到很好的照顾,我很高兴。 I’ m very glad to good care of in the nursery. 3)有人看见他一小时前离开了。 He an hour ago. 【 拓展 】 _________________________________________________(哪些词 )与 see有这种 相同用法。 请在文中划出类似结构。 5. 【 原句回放 】 Standing inside were lots of strange creatures with white skin and large black eyes.(P2, L3638) 这是个 ____________(句型 ), 正常语序是 : 在英语中,当句子的主语太长,或说话人想要强调对动作的描写时, 可以把现在分词短语和主语部分的位置交换, 形成 “ 现在分词短语+ be动词+主语 ” 的倒装结构。 小试牛刀。 1) Growing around the lake are trees of different kinds. 2)躺在那儿的是一个瘦弱的黑人妇女。 3) 一个姑娘正站在那儿。 (两种句式) ___________________ _____________________________________________ 【 总结 】 倒装句结构是: __________________________________________ 【 拓展 】 当 here, there, then等副词放、 in, out, up, down等方向性副词或介词短语放句首,句子则需要 __________________。 eg. Here es the bus./ On the floor were piles of books, magazines and newspapers. 特例:当句子主语为代词时,主谓不倒装. : There he es. 小试牛刀。 1) Distinguished guests and friends, wele to our the ceremony of the 50th Anniversary this morning are our alumni(校友 ) from home and abroad. A. Attend B. To attend C. Attending D. Having attended 2) In the dark forest ___, some large enough to hold several English towns. A. stand many lakes B. lie many lakes C. many lakes lie D. many lakes stand 3) Hearing the dog barking fiercely, away __________. A. running the thief B. was running the thief C. the thief ran D. ran the thief 4) Ladies and gentlemen, wele to my program. ______me this evening is Dr Gray. A. To join B. Join C. Joined D. Joining 6. 【 原句回放 】 The aliens took me aboard the UFO so that they could do research on me. (P3, L5961) 该句中 so that引导 从句,此时从句中须有情态动词;so that引导 ________________________从句时,从句中不用情态动词。 比较下面两句,分别指出 so that 引导什么从句: 1) I got up ear。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。