牛津译林版英语高三module9unit3themeaningofcolourxword学案内容摘要:

that, so …that, such …that 引导。 七、让步状语从句 由 though, even though, however, no matter how/what/who 等引导。 八、比较状语从句 由 than, the more…the more, as…as 引导。 九、方式状语从句 由 in the same way, as 等引导。 ● As the sun rose the fog dispersed. ● Whenever she had a cold, she ate only fruit. ● Now that we have decorated the house, we can move in. ● The thread breaks where it is weakest. ● Robbie didn’t feel as she did. ● She ought to e down just in case anything happened. ● If necessary, ring me at home. 3) Idioms often use a number of words to represent a single。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。