4581 CMOS 4位算术逻辑单元内容摘要:
006500760085is a LU of 6 6 on 4of is or is to S0 3) by a to to to be or P) G) to in on by as a a ) is in of at is = B a LU n+4be to as in 0118 0119 0118 0119 B 4181. dc 8 owow( 0.5 DC 0.5 DC 10 500 65 150 8260 to P ” 7.0 0095C 5o 125L” 12 0095C 00o 12519951/9423 55 25C 09512 55525 0” ” 0 0” O= 4.5 (9.0 (13.5 ” O= 0.5 (1.0 (1.5 0) 150300600(50 pF on (A/f + (A/f + (A/f + is to be is as an of Cs *5To at 0 T(= 0 + (50) A ( V = (in f in is k = to to or be to avoi。4581 CMOS 4位算术逻辑单元
相关推荐
0065toin on is in of is ndis to a as dc 8 488 22 (0.5 18 0.5 10 A 55 125 65 150 to P ” 7.0 5o 125” 12 0095C 00o 125C(t1) R(t1) X X 1 X 0 0 0 1 0 0 0 X t t1 = C(t1) X 0 0 0 1 1 19951/9420 55 25C 48510
00830084is a OS on a is a an R of up of a in dc 8 owow( 0.5 DC 0.5 DC 10 500 65 150 8260 to P ” 7.0 0095C 5o 125L” 12 0095C 00o 1256 57 22 31 3619951/9420 55 25C 48D 51 0 0 Z 0 Z 00 0 1 0 1 0 1 00 1
let’s watch a。 While reading 1. 两人一组,编写对话。 A: What do you want to watch tonight? B: I want to watch.... A: Why? B: Because....... 2. 读 2d对 话,回答问题: 1) What can’t Grace stand? What does she love? 2)
to to or to or to of on is to of at of to of of to at of Is to to of of is by R “. O N R R F N S T to s be by to or no or TI or or is or I or to or in or be or TIs of s or Is or 1998, ncorporated
I don’t mind / love / can’t stand them. While listening (1) 听 1b中的录音, 写出你所听到的顺序。 (2) 再听一遍 1b的录音,检测你的 1b答案是否正确 . (3) 根据 1c的内容,两人一组练习对话。 A: What do you want to watch? B: What do you think of......? A:
1、 北阳电子技术有限公司保留对此文件修改之权利且不另行通知。 北阳电子技术有限公司所提供之资讯相信为正确且可靠的,但并不保证本文件中绝无错误。 请于向北阳电子技术有限公司提出订单前, 自行确定所使用之相关技术文件及规格为最新之版本。 若因贵公司使用本公司之文件或产品,而涉及第三人之专利或著作权等智慧财产权之应用及配合时,则应由贵公司负责取得同意及授权,本公司仅单纯贩售产品,上述关于同意及授权