20xx春鲁教版英语六下unit10isthereapostofficenearhere第四课时word教学设计内容摘要:

(At the sam e time, students step into the second step slowly, some by some.) Step Two: Learn by themselves. (20m) Students: 1. Choose learning aims. 2. Learn the new content. 1) Learn the new words, try to read and spell them correctly. 2) Read the passage in 2b, answer the questions in 2c. 3) Read and try to recite the passage in 2b. Teacher: Watch the students and help them whenever necessary. Gather questions. Step Three: Discussion (5m) Talk about the problems together. Step Four: Practice: (10m) Retell the passage by yourself, use as many drills as possible.。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。