新人教版英语九年unit10bythetimeigotoutside,thebushadalreadyleftppt课件a内容摘要:

she got up, her brother had already gotten in the shower. And by the time she got outside, the bus had already left. So she had to run to school. When she got to school, she realized she had left her backpack at home. 2a Number the pictures 14 in the correct order. 1 2 3 4 2b Fill in the blanks with the correct verb forms . Then listen again and check your answers. I_________ (get home), I________ (realize) I ________ (leave) my keys in the backpack. the time I _____ (get) back to school, the bell _________ (ring). the time I ________(walk) into class, the teacher ____________ (start) teaching already. realized got home got had rung walked had started had left 2c PAIRWORK Make up an ending for the story and share it with the rest of the class. The teacher looked at Tina and asked her to sit back her seat. After class, the teacher asked Tina to e to her office and why she was late. Tina told her the whole story this morning. The teacher asked her to get up earlier and not to be late for class. 3a Read the story and write the events in the correct order. 1. My father went into bathroom. 2. I took a quick shower. 3. I had some breakfast. 4. I ran off to bus stop. 5. The bus left. 6. I started walking. 7. They gave her a ride. / 8. I got to school. 9. The bell was ringing. 10. I got into the cl。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。