商务英语口语900句内容摘要:

商务英语口语900句 望与要求 d to to on of of to to we to is to to a of s to to 7.I ll we to at to to in to we be to in 11.I we do to 12.I we 13.I we to of is us to to to be to at an of be as as be no of of in us a as as be to a 27.I do in of in 29.I to of to 产品介绍 of is we is by as as in a 30% it to of in a of by is of be in to of of 0 K/H . to of of to of is of on a of is of as as as of by at of we of in to of of in 0% I to of in of 52. “to be in to in is we in in to of is in p。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。