牛津译林版英语高三module9unit3themeaningofcolourppt公开课课件内容摘要:

___ and fought for it. The Indonesian flag came into use ______ on17 August 1945. It is based on a national flag ______ back to the 13th century. Every independent country has a unique flag, which represents the country and symbolizes the origin of that country and its culture. The French flag is red, white and blue, which was first used at the start of the French Revolution. The USA also began using a red, white and blue flag called Stars and Stripes. The USA was once a land colonized by Britain. Colonists were unhappy with the way Britain ruled the country. They desired independence and fought for it. The Indonesian flag came into use officially on17 August 1945. It is based on a national flag dating back to the 13th century. 高考英语阅读理解主旨 大意题的阅读技巧 1)What does the writer mainly tell us? 2)Which of the following can summar ize the main idea of this text? 3)Which of the following best expresses the main idea? 4)Which is the subject discussed in the text? 5)What’s the best title for this passage? 在高考英语阅读理解中常见到这样的提问形式 : 这种题型称作主旨大意题 如何做主旨大意题 • 做此类题目时,首先要搞清是问某一段还是全文的大意,可利用文中主要信息来把握文脉,进行综合归纳,概括文章的主题。 第一:如有标题,标题。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。