牛津译林版英语高二上册module5unit2theenvironment之六内容摘要:

ain ideas structure of the article Paragraph 1 Paragraphs 24 Paragraph 5 The environmental problems of the Yangtze River have raised concern. ( raising the issue) A lot of work has been done to protect the river. (how to solve the issue) The environmental situation of the Yangtze River is improving. (conclusion) Do you think the environmental situation of the Yangtze River is getting better? Why? What else can we do to protect the Yangtze River? … ,依赖 … … 结果 ,导致 … 造成有害影响 third longest river was reported that… on =depend on is it good news… in to harmful effects on is/was reported that sb/sth… 据报道 … =Sb/Sth is/was reported to do… billion tons of untreated human and industrial sewage was reported to be deposited into the river. It is said/thought/supposed/known… that… It is said that the book has been translated into several languages. =The book is said。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。