40100 CMOS 32位双向静态移位寄存器内容摘要:

R T 2010V, 5V F 100T 18V 5F o. 13A, ”F ”B”9896or is 2 at is is at a is at a is If is at a is at 2nd is of or on of 2nd is at on No on if is at Y(1(in 2nd is is st to 2nd is (* 0.5 20 0.5 18 0.5 10 525405C 65 150 835 55 125405Cto is a of at or in of is to 33 1 0 0 0 1 0 2X 1 X 0 = = = t No 1) ) ( 2 ( ). 2) 0 10X/ 1 X 1 1 X O|25) (V) (A) (V)5 5 5 1500 10 10 0 3000/15 15 20 0 6000/20 20 100 00 30005 5 20 0 1500/10 10 40 0 3000/15 15 80 0 6005 1 5 0 1 10 5 1 15 1 5 1 10 1 15 55 40C CF + 125 + 851” 0” 1V 5V, 2V 10V, 3*55 40C CF + 125 + 85bot。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。