三洋血液冰箱使用手册——mbr-304d内容摘要:

tegories (Overvoltage Categories) II。 For mains supply the minimum and normal category is II。 8. Pollution degree 2 in accordance with IEC 664. REFRIGERATOR COMPONENTS 8 REFRIGERATOR COMPONENTS 1. Door switch: To detect the door status (open/close). 5 6 12 7 9 8 10 1 2 3 4 13 11 14 15 16 17 18 19 20 21 MBR304G 9 2. Battery switch: ONOFF switch for builtin battery for power failure alarm. Always turn on this switch when the refrigerator is operated. Turn off this switch when the refrigerator is not used for long period to protect the battery. 3. Power switch: Main switch of the unit. 4. Glow starter: For a fluorescent lamp. It is remended to replace the glow starter at the time of replacement of fluorescent lamp. Refer to page 21 for the replacement. 5. Control panel: Panel can be opened when upper right corner of the lower part cover is pushed. The running status is displayed on this panel and temperature setting is acplished through this panel. Refer to page 10 for details. 6. Light switch: This switch is used for turning the fluorescent lamp off and on. 7. Glass window: The window may have condensation in high humidity environment. Wipe off the condensation with a soft dry cloth. 8. Handle: Always hold the handle when opening/closing the door. 9. Lock: Turn the key counterclockwise through 180o to securely lock the door. 10. Fluorescent lamp: 15 W lamp. Normally turn off the lamp. See page 20 for the replacement. 11. Monitor bottle for temperature sensor (2 locations): The bottles has a sensor to display the chamber temperature. Fill the bottle with 200ml of 10% glycerol or water before mencing the operation. Refer to page 13 for filling the monitor bottle. 12. Access port: This port allows temperature measurement cables or sensors to enter the chamber from outside. 13. Shelf (MBR304D, MBR304G), Drawer (MBR304DR, MBR304GR): Items to be stored in the chamber must be placed on the shelves or drawers. The maximum storage weight for each shelf or drawer is 20 kg. Do not put stored items directly onto the interior floor of the chamber. 14. Condensation tray: The condensation on the door is accumulated in this tray. Wipe off the water occasionally. 15. Caster: Used when moving the unit. When installing the unit the castors can be raised from the ground by using the leveling feet. 16. Leveling foot: Adjust the height of the leveling foot to install the refrigerator in level. See page 12 for details. 17. Automatic temperature recorder: For details, see the instruction manual of the recorder enclosed with the unit. 18. Air exhaust vent: Do not block this vent. Care should be taken not to expose the stored items to direct cooled air. 19. Inner door: Made of acrylic resin. For cleaning, use the diluted neutral dishwashing detergent 20. Air intake vent: Do not block this vent. If this vent is blocked, temperature regulation will bee unstable. Do not insert fingers or any substances into the vent because the circulating fan is running inside the vent. 21. Door latch: By turning the latch downward, the door is locked. A padlock can be provided separately. REFRIGERATOR COMPONENTS Control panel and keypad 7 8 9 10 11 10 1. Alarm buzzer stop key (BUZZER): To silence the audible alarm, press this key. 2. Temperature display key (UPPER/LOWER): By pressing this key, the displayed temperature is changed。 upper monitor bottle temperature, lower monitor bottle temperature, and average temperature of upper and lower monitor bottles are displayed in sequence. 3. Alarm test key (ALARM TEST): To check the operation of alarm buzzer, lamp, and remote alarm terminal. 4. Calibration key (CAL): To calibrate the temperature. This key is used only when the temperature calibration is necessary. 5. Digit shift key ( ): Pressing this key in the CAL mode will cause the changeable digit to shift. 6. Numerical value shift key ( ): Pressing this key in the CAL mode will cause the numerical value to change. 7. Door check lamp (DOOR): This lamp is lit when the door is ajar or open. 8. Alarm lamp (ALARM): This lamp blinks during an alarm condition (temperature alarm or power failure alarm). 9, 10. Temperature display monitor lamp (UPPER, LOWER): Lamp 9 is lit when upper monitor bottle temperature is displayed. Lamp 10 is lit when lower monitor bottle temperature is displayed. Both 9 and 10 are lit when the average temperature of lower and upper monitor bottle temperature is displayed. 11. Digital temperature indicator: This indicator shows the current chamber temperature. INSTALLATION Installation site 11 To operate this unit properly and to obtain maximum performance, install the unit in a location with the following conditions: • A location not subjected to direct sunlight Installation in a location subjected to direct sunlight may lead to inadequate cooling. • A location with adequate ventilation Leave at least 10 cm around the unit for ventilation. Poor ventilation will result in a reduction of the refrigeration capacity. • A location away from heat generating sources Avoid installing the unit near heatemitting appliances such as gas ranges or stoves. Heat can cause inefficient refrigeration. • A location with a sturdy and level floor WARNING Install the unit on a sturdy floor. If the floor is not strong enough or the installation site is not adequate, this may result in inju。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。