外研版(一起)英语六下module9unit1练习题试题内容摘要:
ms ________. A. are being painted B. are painting C. are painted D. are being painting 22. If the city noises _______ from increasing, people ______ shout to be heard at the dinner table 20 years from now. A. are not kept。 will have to B. are not kept。 have to C. do not keep。 will have to D. do not keep, have to 23. — ________ the sports meet might be put off. — Yes, it all depends on the weather. A. I’ve been told B. I’ve told C. I’m told D. I was told 24. You don’t need to describe her. I _______ her several times. A. had met B. have met C. met D. meet 25. I don’t think Jim saw me。 he ______ into space. A. just stared(凝视) B. was just staring C. has just stared D. had just stared 26. — _______ my glasses? — Yes, I _______ them on your bed a minute ago. A. Do you see。 saw B. Had you seen。 have seen C. Have you seen。 saw D. Would you see。 saw 27. — We could have walked to the station。 it was so near. — Yes. A taxi _______ at all necessary. A. wasn’t B. hadn’t been C. wouldn’t be D. won’t be 28. — Who is Jerry Cooper? — ______? I saw you shake hands with him at the meeting. A. Don’t you meet him yet B. Hadn’t you met him yet C. Didn’t you meet him yet D. Haven’t you met him yet 29. — Nancy is not ing tonight. — But she _______! A. promises B. promised C. will promise D. had promised 30. _______ it with me and I’ll see what I can do. A. When left B. Leaving C. If you leave D. Leave 31. — Can you attend the party tomorrow? — I think I can when my headache ________ thoroughly.(完全)。外研版(一起)英语六下module9unit1练习题试题
本资源仅提供20页预览,下载后可查看全文
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。
相关推荐
高温平菇栽培技术要点
1、温度类型可分为高温型、中高温型、广温偏高型、广温偏中型、广温偏低型及中低温型,要获得平菇的优质高产,正确选择品种很重要。 以上品种中,因高温平菇出菇期气温高,病害多,所以种植量相对偏少。 但高温期平菇的价格却是秋冬期的 23 倍,因此近几年种高温平菇的菇农越来越多,但因技术难度大,成功率很低。 笔者根据多年在基层推广平菇的经验,特对高温平菇的管理提出以下建议,以供广大菇农参考。 一
高温季节栽培蘑菇三个关键环节
1、要把握好三个技术环节。 一、选择适宜的高温型菌种 目前较耐高温的蘑菇菌种有新澄 96、苏蘑一号等。 其中新澄 96 发菌温度为1836,发菌最适温度为 2533。 出菇温度为 20 一 36,出菇最适温度为2433,是目前最耐高温的菌种。 此菌种最大的优点是蘑菇采下 23 天不变色,不易开伞,易于保鲜,缺点是菌丝发菌速度慢,分解力较弱,对培养料质量要求较高。 较适宜安排在 56 月播种,69
外研版(一起)英语一下期末试题试题
meat. B. She is a cook. 三、听力题,写出听到的字母。 ( 10 分) 1 2 3 4 5 6 7 8 9 10 四、连线题。 ( 20 分) 1) 医生 冰淇淋 小学生 老师 汤 1
外研新标准版初中英语八年级下册期中测试题1
stmas card. The paper tried to run, but it failed( 失败 ) . And the paper closed its eyes. When it woke up( 醒来 ) , it realized it was quiet. The paper looked around and realized it was sitting next to