初中英语模拟试题二内容摘要:
yer likes the oppon ent (对手 ) to play as well as he does. But it was holiday time and I agreed to play. We placed the board (棋盘 ) in the garden. The game began. I hoped it would be quick──and so it was. “ I soon knew that David Prag was no learner. After ten minutes his sister came outside and began to play tennis against a boy seemed to lose interest in our game. He moved a piece (棋子 ) without care. I gave my attention to the board. “ ‘Call me when you are ready, Mr Watson,’he said. “When I was ready?I looked had gone off to play with his sis studied the board──and found I was driven into it went on with David: a quick move, then tennis, back to the board,then back to his sister. My difficult condition became impossible to change. I was beaten,oh so easily,by a tenyearold chess was the winner── in twentyeight minutes. “David Prag: a name to remember. I had a chance to use his game today, and it won this cup for me. To him, of course, it is only one of a hundred, or perhaps a thousand, winning games.” 根据以上短文内容,从下列各题所给的四个选项中选择最佳的一项。 36. When Mr Watson said, “It isn39。 t rightly mine. It was won „”,he meant _________________ two years before. A. he had played chess with a little boy for twentyeight minutes B. he had had a chance to take part in an important game C. he had learned how to play chess from a child D. he had learned a good game from a child ( ) 37. Befor the game, Mr Watson was quite sure that _______________. A. the boy played as well as he did B. he would be Southern Chese Master two years later C. he could win the game easily D. the boy would win the game quickly ( ) 38. Why did David play tennis while he was playing chess with Watson? Because he _________________. ( ) A. had no interest in playing chess with adults (成年人 ) B. was not good at playing chess C. liked playing tennis much better than playing chess D. played chess much better than Watson 39. From the story, we know that ________________. A. David Prag was the real winner B. Mr Watson was the real winner C. neither of them was the real winner D. both of them were the real winners ( ) 40. Which of the following (下列 ) is NOT true? A. Sometimes young children can beat adults in playing chess. B. Watson thought he could win the game quickly, and so he did. C. Watson learned something from David and won the silver cup. D. Watson would never fet the name of the boy. ( ) 五、完形填空 通读下面短文,掌握其大意。 然后从短文后各题所给的四个选项中选择最佳的一项。 Mr and Mrs Moore were invited to a Christmas party at a hotel one year. They (41) their car outside and went in. Mr Moore had never got drunk (醉 ) before, so he was (42) not to drink too much, (43) his friends asked him to drink more (44). During the party,Mrs Moore found that she had (45。初中英语模拟试题二
相关推荐
________________ 1文中能概括本次战斗的特点并在结构上起重要作用的句子是 ___________( 1分) 1文中最后一句突出表现的是 ____________________________( 1分) 三、课外现代文阅读( 20分) 丙( 10分) 下面是《中国教育报》的一则新闻报道,读后回答问题。 本报讯(记者鲍道苏)① 4月 24日下午,在春光明媚的清华园里
____,丁文 的体裁是 ____________( 2分)。 丙、丁两文所表达的中心内容各是什么。 请用横线在文中分别标出( 6分)。 对丙、丁两文所表达的共同点归纳完全正确的一项是: ________________。 ( 2分) A、 人类智慧和知识可以从图书中获取。 B、 人类智慧和知识必须用金钱才可换取。 C、 人类智慧和知识只能从图书中获得。 D、 人类智慧和知识只有从生活中才可获得
B、巴尔扎克、鲁迅的成就。 C、爱迪生、鲁迅和巴尔扎克的成就。 文中爱迪生、鲁迅、巴尔扎克事例的排列顺序中,不能把鲁迅调到第一位的原因是 ( 2分) 本段的论据有:( 2分) A、道理论据是。 B、事实论据是。 (三)课外现代文阅读( 20分) 丙( 10分) ① 有多少心灵在这个时代被抛至万丈深渊呢。 面对众多在挣扎在碰撞的人,真还得进一言:学会适应。 ② 达尔文说:“适者生存”
翻译: ⑶ 定伯便担鬼著肩上,急执之。 翻译: 第二部分 阅读训练(40分) 阅读《为学》选段做6~11题。 ( 20 分) 吾资之 昏. ,不逮人也;吾材之庸,不逮人也。 旦旦而学之,久而不怠焉,迄乎成,而亦不知其昏与庸也。 吾资之聪, 倍. 人也;吾 材. 之敏,倍人也;屏弃而不用,其与昏与庸无以异也。 圣人之道,卒于 鲁.也传之。 然则昏庸聪 敏之用,岂有常哉。 ⒍解释语段中的加点字。
则依此判断 ,含有同种元素的物质有 (写代号 )______,写化学式 :A为 _____D 为 ______ 分析:实破口为 为 F,对热不稳定分解为 , 和水,由① ,②看出 A为 ,B为 顺序推出 . 答案 :乙 ,A,C,F. ,HCl 例 4铜器在潮湿空气中会生成绿色的锈 ,其成份是碱式盐 ,写出铜锈生成的化合反应的方程式 :_____又知铜锈受热会分解为三种氧化物