机构名称:贵州出入境检验检疫局检验检疫综合技术中心内容摘要:
drum Except for aspect inspection 2 stacking 3 leakage 4 hydraulic pressure 8 Plastics receptacle in steel drum 1 Vertical impact drop SN/T 02691993 Rules for inspection of transport packaging for export modities— Plastics receptacle in steel drum Except for aspect inspection 2 stacking 3 leakage 4 hydraulic pressure ISO/IEC 17025 认可证书 CNASPD20/09B/1 No. CNAS L4393 第 13 页 共 267 页 The scope of the accreditation in Chinese remains the definitive version. № Test Object Item/Parameter Code of Field Title, Code of Standard or Method Limitation Note № Item/ Parameter 9 Dangerous articles package(barrel, can, box, bag) 1 drop 0329 SN/T Rules for the inspection of packaging for dangerous goods exported —first part general rules SN/T Rules for the inspection of packaging for dangerous goods exported—second part performance test Except for Permeability experiment 2 leakage(sealing) 3 hydraulic pressure 4 stacking 5 airproof 10 Woven plastic flexible intermediate bulk containers used for exported dangerous goods 1 drop SN/T 08932020 Rules for the inspection of performance test of woven plastic flexible intermediate bulk containers used for exported dangerous goods by sea transport Except for stacking test 2 collapsed 3 Normotopia ISO/IEC 17025 认可证书 CNASPD20/09B/1 No. CNAS L4393 第 14 页 共 267 页 The scope of the accreditation in Chinese remains the definitive version. № Test Object Item/Parameter Code of Field Title, Code of Standard or Method Limitation Note № Item/ Parameter 10 Woven plastic flexible intermediate bulk containers used for exported dangerous goods 4 Crane mention 0329 SN/T 08932020 Rules for the inspection of performance test of woven plastic flexible intermediate bulk containers used for exported dangerous goods by sea transport Except for stacking test 5 rip 11 Export flexible intermediate bulk containers 1 Crane mention SN/T 12592020 Rules for the inspection of export flexible intermediate bulk containers Except for physical inspection items、 stacking test amp。 cyclical Crane mention 2 Vertical impact drop 3 Tear spread 4 dump 5 Normotopia ISO/IEC 17025 认可证书 CNASPD20/09B/1 No. CNAS L4393 第 15 页 共 267 页 The scope of the accreditation in Chinese remains the definitive version. 中国合格评定国家认可委员会 认 可 证 书 附 件 (注册号: CNAS L4393) 名称 : 贵州出入境检验检疫局检验检疫综合技术中心 地址:贵州省贵阳市北京路 2 号 签发日期: 2020 年 01月 16 日 有效期至: 2020 年 01 月 15日 更新日期: 2020 年 01月 16 日 附件 1 认可的授权签字人及领域 序号 姓 名 授权签字领域 备 注 1 钱兆鹏 化工、矿产、磨料、有色金属、铁合金类的 检测项目 2 赵 明 化工、矿产、磨料、有色金属、铁合金类的 检测项目 3 李春萍 化工、矿产、磨料、有色金属、铁合金类的 检测项目 4 蔡 秋 食品、食品添加剂、食品相关产品、化妆品、纺织品、环境样品、原料药及中西药制剂的检测项目 5 朱 明 食品、食品添加剂、食品相关产品、化妆品、纺 织品、环境样品、原料药及中西药制剂的检测项目 6 焦彦朝 食品、食品相关产品、化妆品、动植物检疫、 转基因农产品的检测项目 7 曹云恒 食品、食品相关产品、化妆品、动植物检疫、 转基因农产品的检测项目 8 周富强 化工、矿产、磨料、有色金属、铁合金类的 检测项目 ISO/IEC 17025 认可证书 CNASPD20/09B/1 No. CNAS L4393 第 16 页 共 267 页 The scope of the accreditation in Chinese remains the definitive version. CHINA NATIONAL ACCREDITATION SERVICE FOR CONFORMITY ASSESSMENT APPENDIX OF ACCREDITATION CERTIFICATE (Registration No. CNAS L4393) NAME:Inspection and Quarantine Comprehensive Technology Center of Guizhou EntryExit Inspection and Quarantine Bureau ADDRESS:, Beijing Road, Guiyang, Guizhou, China Date of Issue:20200116 Date of Expiry:20200115 Date of Update: 20200116 APPENDIX 1 ACCREDITED SIGNATORIES AND SCOPE № Name Authorized Scope of Signature Note 1 Qian Zhaopeng Test items of Chemical, Mineral, Abrasive, Nonferrous metals and Ferroalloy categories. 2 Zhao Ming Test items of Chemical, Mineral, Abrasive, Nonferrous metals and Ferroalloy categories. 3 Li Chunping Test items of Chemical, Mineral, Abrasive, Nonferrous metals and Ferroalloy categories. 4 Cai Qiu Test items of Food and related products,Food additives, Cosmetics, Textiles, environmental samples, raw material medicine, Chinese and Western medicine preparations. 5 Zhu Ming Test items of Food and related products,Food additives, Cosmetics, Textiles, environmental samples, raw material medicine, Chinese and Western medicine preparations. 6 Jiao Yanchao Test items of Food and related products, Cosmetics, quarantine of animals and plants, Geically Modified Agricultural Products. ISO/IEC 17025 认可证书 CNASPD20/09B/1 No. CNAS L4393 第 17 页 共 267 页 The scope of the accreditation in Chinese remains the definitive version. № Name Authorized Scope of Signature Note 7 Cao Yunheng Test items of Food and related products, Cosmetics, quarantine of animals。机构名称:贵州出入境检验检疫局检验检疫综合技术中心
相关推荐
《电磁辐射暴露限值和测量方法》 GJB53132020 13 电子及电气元件 1 温度冲击试验 0418 《电子及电气元件试验方法》 GJB360B2020 2 高温寿命试验 3 密封试验 4 微粒碰撞噪声检测 5 X射线照相检验 ISO/IEC 17025 认可证书 CNASPD20/09B/1 No. CNAS L0910 第 13 页 共 185 页 The scope of the
inese and English versions of the scope of accreditation, the Chinese version shall prevail in that the English version is provided by the conformity assessment body and is for reference only. 序号 检测
the accreditation in Chinese remains the definitive version. 序号 检测 对象 项目 /参数 领域 代码 检 测 标准( 方 法 ) 名 称及编号(含年号) 限制 范围 说明 序号 名称 1 钢铁材料 33 脱碳层深度 035102 钢的脱碳层深度测定法 GB/T2242020 只做金相法、显微硬度法 34 非金属夹杂 035104
sulationDetermination of steadystate thermal resistance and related propertiesGuarded hot plate apparatus GB/T102942020 Test method for thermal conductivity of plastics by mean of the guarded hot
0 《水准仪检定规程》 i:177。 30 ″ ( 2m ~ ∞) i: U=″ 21 精密压力表 和真空表 压力 1320 JJG491999《弹簧管式精密压力和真空表检定规程》 ( ~0) MPa Urel=% (~60)MPa Urel=(%~% 22 机械天平 质量 1311 JJG982020《机械天平检定规程》 10mg~1kg U=(~)mg 23 电子天平 质量 1311
技术管理标准 ,做好本单位机、电设备的管、用、养、修、查、改工作。 向公司有关部门书面报告机损事故经过。 召集有关人员参加事故分析会。 提出为预防类似机损事故而采取的整改措施,并上报技术设备部。 安全质量部的职责和权限 监督、检查、落实机械电气安全操作规程。 保护机损事故现场。 参加机损事故分析会。 4 机损事故处理程序 机损事 故发生后,事故岗位人员应立即报告生产调度长