工程机械词典内容摘要:

具包 [组件 ] adapter lock;适配锁 adapter mounting bolt;适配安装螺栓 adapter nose;适配前缘 adapter nut;适配螺母 adapter part;适配零件 adapter plate;适配板 adapter ring;适配环,接合环 adapter sleeve;适配套筒,连接套管 adapter splined shaft;适配花键轴 adapter tube;适配管 adc;模 数转换器 add;加,增加,加法,附录,补充 add oil mark;添加机油记号 add up;合计 added;增 [追 ]加的 added cost;附加成本 added force;附加力 added length;附加长度 added load;附加负载 added precaution;格外注意 added proof;附加证据 added spring;附加弹簧 added strength;附加强度 added weight;附加重量 adding;加,接长 addition;加 [法,成 ],添加,添加剂 additional;附 [追,外 ]加的,补充的,辅助的,更多的 additive; [相,附,增 ]加的,加 添的,辅助的,添加剂 additive package;额外包装,添加剂包 additive system;辅助系统 additive truck;辅助货车 address;地址 adherence;附着 (力 ),坚持,固执 adhesion;粘 [附 ]着,附着 (力 ) adhesive;附着力,粘合剂,附着的,粘性的 adhesive sealant;粘性密封剂 [层 ] adjacent;邻近的 adjacent crankshaft counterweight;相邻曲轴平衡块 adjacent cylinder;相邻气(油)缸 adjoining cylinder;毗邻气(油)缸 adjoining gear;毗邻齿轮 adjoining hole;邻接孔 adjoining pump;邻接泵 adjustable;可调 [整,节,准 ]的,可核准的 adjustable armrest;可调扶手 adjustable boom;可调吊臂 adjustable bypass valve;可调旁通阀 adjustable cooldown time;可调冷却 [退火 ]时间 adjustable electromagic transducer;可调电磁传感器 adjustable end play;可调轴向 [端 ]间隙 adjustable engine speed setting;可调发动机速度调定 adjustable exhaust bypass valve;可调排气旁通阀 adjustable fitting;可调配合 adjustable fitting group;可调配合组件 adjustable lifting beam;可调起重梁 adjustable pin;可调销轴 adjustable relief valve;可调安全阀 adjustable restrictor orifice;可调阻尼器孔 adjustable ripper;可调裂土器 adjustable seat group;可调座位组件 adjustable sequence valve;可调顺序阀 adjustable spanner wrench;可调开脚 [插头 ]扳手 adjustable speed droop;可调速度降 adjustable steering column;可调转向柱 adjustable stop;可调限位挡 铁 adjustable time period;可调时间间隔 adjusted;经过调整的 adjusted belt tension;调整皮带紧度 [张力 ] adjusted rod;可调连杆 adjusted rod assembly;可调连杆总成 adjusted seat belt;座位安全带调节 adjusted specification;调整技术规格 adjusted value;调整值 adjuster;调节器 adjuster arm;调节器臂 adjuster assembly;调节器总 成 adjuster cover;调节器盖 adjuster cylinder;调节器油[气]缸 adjuster mounting bolt;调节器固定螺栓 adjuster nut;调节器螺母 adjuster plug;调节器螺塞 adjuster roller bracket;调节器滚子保持架 adjuster screw;调节器螺丝 [钉 ] adjusting;调整,调节 adjusting bolt;调整螺栓 adjusting bracket;调整托架 adjusting bracket bolt;调整托架螺栓 adjusting bracket lock bolt;调整托架锁定 [固紧 ]螺栓 adjusting bracket nut;调整托架螺母 adjusting collar;调整卡圈 adjusting disc;调整圆盘 adjusting function;调整功能 adjusting instruction;调整说明 adjusting knob;调整按钮,旋钮 adjusting locknut;调整防松 [固紧 ]螺母 adjusting mechanism;调整机构 adjusting module;调整装置 [模件 ] adjusting nut;调整螺母 adjusting nut lock;调整螺母锁定装置[锁片 ] adjusting pin;调整销 adjusting plate;调整板 adjusting plate bolt;调整板螺栓 adjusting plate group;调整板组件 adjusting potentiometer;调整电位计 adjusting procedure;调整步骤 adjusting pulley;调整皮带轮 adjusting rate; 调整率 adjusting ring;调整环 adjusting ring lock;调整环锁定器 adjusting rod;调整连杆 adjusting rod assembly;调整连杆总成 adjusting rod locknut;调整连杆防松 [止动 ]螺母 adjusting screw;调整螺钉 adjusting screw hex;调整六角螺钉 adjusting screw locknut;调整螺丝防松[止动 ]螺母 adjusting screw locknut design;调整螺丝防松 [止动 ]螺母的设计 adjusting screw side;调整螺丝侧 adjusting shaft;调整轴 adjusting sleeve;调整套筒 adjusting specification;调整技术规格 adjusting specifications form number;调整技术规格类型号 adjusting specifications module;调整技术规格模数 adjusting strap;调整系带 adjusting stud;调整螺柱 adjusting technique;调整技术 adjusting tool;调整工具 adjusting wheel;调整轮 adjusting wrench;调整扳手 adjustment access hole;调整用检视孔 adjustment access plate;调整用检视板 adjustment assembly;调整总成 adjustment assembly mount shaft;调整总成悬挂轴 adjustment bar;调整棒 adjustment bolt;调整螺栓 adjustment chart;调整图 表 adjustment check;调整检查 adjustment dial;调整刻度盘 [控制盘 ] adjustment dimension;调整尺寸 adjustment group;调整组件 adjustment guide block;调整导轨 (块 ) adjustment information;调整资料 adjustment knob;调整按钮 [旋钮 ] adjustment lever;调整杠杆 adjustment link;调整连杆 [链节 ] adjustment lock;调整锁定器 adjustment locknut;调整止动螺母 adjustment mark;调整记号 [标记 ] adjustment mechanism;调整机构 adjustment method;调整方法 adjustment nut;调整螺母 adjustment pin;调整销 adjustment plate;调整板 adjustment plug;调整螺塞 adjustment plunger;调整柱塞 adjustment potentiometer;调整电位计 adjustment procedure;调整步 骤 adjustment range;调整范围 adjustment reading;调整读数 adjustment rheostat;可调变阻器;调整变阻器 adjustment ring;调节环 adjustment rod;调节杆 adjustment rod end;调节杆端部 adjustment rod pin;调节杆销 adjustment screw;调整螺钉 adjustment screw chart;调整螺钉图表[卡 ] adjustment screw cover;调整螺钉盖 adjustment screw locknut;调整螺钉止动螺母 adjustment screw nut;调整螺钉螺母 adjustment section;调整部分 adjustment setting;调整的调定 adjustment shaft;调整轴 adjustment shim;调整垫圈 [片 ] adjustment spindle;调整主轴 [心轴 ] adjustment spring;调整弹簧 adjustment stop;调整限位挡铁 adjustment tool;调整工具 adjustment wheel;调整轮 adjustment yoke bracket;调整叉臂架 adjustments section;调整部分 [截面 ] adsorption;吸附 (作用 ),表面吸收 adt;调整,解除保险延时计时器 adt front frame;调整前机 [车 ]架 advance;先进,先期,提前 advance signal pressure;压力提前信号 advance signal timing;正时提前信号 advance timing ponent;正时提前部件 advance timing groove;正时提前槽口 advance unit;先进单元;提前装置 advanced;先进的,先期的,在前面 advanced diagnostics;早期诊断 advanced signal;提前信号 advantageous;占优势的,有利的,便337 利的 adverse;相反的,有害的 adverse condition;不利情况 [条件 ] adverse ground condition;不利的地面情况 advice;劝告,意见,通知 advisable;可劝告的 advise;劝告,建议 aec motor;发动机转速自动调节马达 aec pressure;发动机转速自动调节压力 aec pressure switch;发动机转速自动调节压力开关 [继电器 ] aec relay;发动机转速自动调节继电器 aec relay system;发动机转速自动调节继电器系统 aec switch;发动机转速自动调节开关 aec switch system;发动机转速自动调节开关系统 aec switch system problem;发动机转速自动调节开关系统问题 aec system;发动机转速自动调 节系统 aeis;自动乙醚喷射系统 aeration;通风,充气,吹风,松散 aerodynamic;空气动力学的 aerodynamic drag;气动阻力 aerodynamic efficiency。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。