xx大学毕业论文工厂安全工程设计关键技术研究及其应用内容摘要:

............................................................52 致谢 ............................................................................................................................................53 参考文献 .....................................................................................................................................54 附录一 烟花爆竹产品分类 ...........................................................................................................55 附录二 烟花爆竹工厂建筑危险性等级划分 ..................................................................................56 附录三 英文文献 .........................................................................................................................57 附录四 中文翻译 .........................................................................................................................72 XX 大学本科毕业论文 摘要 I 摘 要 在我国逐步 解除 烟花爆竹禁放的规定后,烟花爆竹生产产业快速发展,但烟花爆竹工厂 设计规范陈旧, 安全工程设计 关键技术研究 仍处于起步阶段。 为确保烟花爆竹生产安全,降低事故损失,研究烟花爆竹工厂安全工程设计 关键技术并提出 合理的 建设 方案,在理论和 实践 上都有重要意义。 (1)本文 结合安全系统工程理论,从人员、 设备 、原料、工艺方法、 作业 环境 5 个方面入手,充分 分析了 导致烟花爆竹生产事故频发的各种因素,为下文关于烟花爆竹工厂安全设计关键技术的研究找出切入点 ; (2)结合爆炸模型理论,构建烟花爆竹药物爆炸 数学 模型,分析爆炸冲击波对人员和建筑物的伤害,确定伤害范围, 再从厂址选择、厂区规划、外部距离、内部距离四个方面着手,研究探讨烟花爆竹工厂规划的关键技术 ; (3)根据爆竹类和组合烟花 (不含亮珠 )产品的生产特点,设计相应的工艺流程,对其生产线的工房配置提出具体要求 , 并为 工艺参数 的确定 提出要求 ; (4)研究 工房墙体、门窗、屋顶 、地面 等结构 的设计方 法 , 提出安全窗不做为安全疏散出口的观点并给出了具体设置要求 , 并 根据 不同的 使用 功能 对各类建筑 分别进行结构分析, 给出 了相应的 具体说明 ; (5)从 工房防 护屏障的设置、药物库区和成品库区的避雷措施、工房供电系统接地、人员静电消除措施 、生产设备的安全防护和配套安全设施的设置 等方面,研究烟花爆竹工厂安全设施设计的关键技术,给出具体设计要求 ; (6)将消防工程知识、低压配电安全知识以及采暖、通风、通讯等系统安全布置要求应用于烟花爆竹工厂安全工程设计,给出消防设计、配电安全设计和配套安全工程的具体 要求; (7)将烟花爆竹工 厂安全工程设计关键技术研究的结果应用于桃源县枫树飞龙烟花爆竹厂 扩改建设 安全工程设计 项目 ,为类似烟花爆竹工厂安全工程的设计作出示范,具有推广价值。 关键词 烟花爆竹 工厂设计 , 安全工程,关键技术 , 消防工程 XX 大学本科毕业论文 ABSTRACT II ABSTRACT Fireworks industry has developed rapidly since the prohibition of fireworks has been eliminated in China, however, the fireworks safety engineering still keeps in the initial stage with the outofdate designs. Therefore, it is great of significance, both theoretically and practically, for us to do some research on the key technologies of the fireworks safety engineering and find out some practical countermeasures so as to ensure the safety of fireworks production and reduce accidents as much as possible. (1) Based on theories related with safety engineering, this thesis, from five aspects, namely, personnel, machinery, raw materials, process methods and production environment, takes all kinds of factors that will cause fireworks accidents into serious consideration in order to provide a good beginning for the research on key technologies in the following chapters. (2) With the direction of explosion model theory, the paper tends to constitute fireworks explosion model, analyze the influence explosion wave has on people and construction, ensure the scope it may do harm and eventually make a discussion on the key technologies about how to design a fireworks factory from four aspects— location, design, outer and inner space. (3) Then, based on the production characteristics of firecrackers and fireworks (excluding light beads), the paper will design related process and offer more specific instructions to the configuration of production assembly line as well as process parameters. (4) The author will discuss the design for wall, door, window, roof, ground, and later provide instructions for various construction structures according to different functions. (5) Fifthly, more discussion on the key technologies about fireworks factory safety design will be done with specific requirements being put forward, considering the protective barrier, lightning protection measures for drug reservoir, grounded power supply system, personnel measures to eliminate static electricity and security production facilities and ancillary facilities. (6) With the application of the knowledge of fire engineering, low voltage distribution along with the safe requirements of heating, ventilation, munications to the fireworks factory safety design, the thesis intends to determine the requirements for fire engineering design, electricity distribution safety design and safety engineering. (7) The oute of this research is encouraged to apply to the safety engineering of Feilong fireworks factory in Taoyuan County and it is believed that it is valuable and XX 大学本科毕业论文 ABSTRACT III meaningful for other fireworks factories. Key words fireworks factory design, safety engineering, key technology, fire fight engineering XX 大学本科毕业论文 第 1 章 绪论 1 第 1 章 绪 论 选题背景 和意义 烟花爆竹是以烟火药为原料制成的工艺美术品,通过着火源作用燃烧或爆炸并伴有声、光、色、烟、雾等效果的娱乐产品, 是中华民俗的重要组成部分。 它既是传统艺术娱乐消费品,同时也是一种需要严格管制的民用 爆炸物品 [1]。 我国是烟花爆竹的发源国,燃放烟花爆竹已有悠久的历史,从李畋的爆竹到令慈禧太后惊讶的地老鼠,再到现在的礼花弹、组合烟花等,烟花爆竹产品已是五花八门,烟花爆竹产业得到了迅速地发展 [2]。 国内外烟花爆竹产业发展现状 (1)国内外生产概况 烟花 爆竹的主要生产国家是中国,日本、意大利、德国和荷兰等国家也有生产,但由于生产的高危险性,烟花爆竹的生产逐步从发达国家退出,中国成为了全球最大的烟花爆竹生产国和出口国,出口烟花爆竹占中国大陆以外市场份额的近 90%。 据统计,截至 2020 年 12 月 31 日,全国有烟花爆竹生产企业 6557 家,主要产区分布在湖南省、江西省和安徽省。 全国烟花爆竹行业年产值超过 200 亿元,出口额约占总产值的 1/4,具体数据见表 11 所示。 表 11 全国烟花爆竹主要产区产值分布表 (截至 2020年 12月 31日 ) 地区 生产企业数(家) 年产 值(亿元) 企业年均产值(万元 /家) 全国 6557 200 305 湖南 2748 120 437 江西 2154 57 265 安徽 298 289 其他 1357 106 图 11 全国烟花爆竹主要产区生产企业年均产值 (截至 2020年 12月 31日 ) XX 大学本科毕业论文 第 1 章 绪论 2 (2)国内外市场概况 随着我 国 相关法规的调整,一些原本实行烟花爆竹禁放的城市已经开始逐步解禁。 截至 2020 年春节,已有 106 个城市 对烟花爆竹的燃放 “ 改禁为限 ” ,占原禁放城市总数的 %[3]。 借助“ 改禁为 限 ”的东风,国内烟花爆竹的消费在逐年增长,同时对外出口市场近年来保持稳定增长态势,市场前景进一步趋好。 据海关统计, 2020 年我国烟花爆竹出口交货值为 亿元人民币, 2020 年出口交货值为 54 亿元人民币,主要的出口销售国家和地区为美国、香港转口。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。