文件和记录控制程序(中英文)内容摘要:
shall fill in revision status on the Document Release/ Withdrawal Sheet so as to control the revision status of released files and prevent from misusing. 有关人员所使用文件严重破损而影响使用时,持有者提出口头申请,经 德信诚 培训网 更多免费资料下载请进: 好好学习社区 体系工程师同意后,才可向文控室以旧换新。 新发的《质量管理手册》、《环境管理手册》和程序文件的分发号要与交回的保持一致,使用者要确保文件保持整洁、清晰。 When document used by personnel concerned is seriously damaged and affects using, the holder shall make verbal request, after consent of ISO specialist and then replace old document with new one from Document Control Office. The issue No. of new Quality Control Manual, Environmental Management Manual and procedure files shall be in line with that of returns. In addition, the user shall keep documents tidy and clear. 受控文件如有丢失,文件持有者应及时报告文控室,并申请补发,经管理者代表批准后,由文控室办理补发手续。 In case that a controlled document is lost, document holder shall report to Document Control Office in time and apply for reissue. After approval of management representative, the Document Control Office will handle the reissue 为了文件得到有效控制,各职能部门需指定一名人员负责文件的接收、管理和控制。 收到文件时应在“文件接收登记表”上进行登记,同时各部门应相应做好本部门的文件控制工作。 Each functional department is required to appoint a person to see to documents’ receiving, management and control in order to control documents effectively. When receiving a document, he/she shall record on the Document Receiving Registration Form, and each department shall implement document control accordingly. 德信诚 培训网 更多免费资料下载请进: 好好学习社区 采用电子档发放的文件,加盖相关印章后,由文控员存放在公司内部局域网 Datacenter/HRD/public 相应的文件夹内,相关人员可以在电脑上阅读文件。 Stamp the Efiles or Edocuments and put into Datacenter\HRD\public relevant folders by file controller! 文件和记录的修订、换版和作废 Revision, update and cancellation of documents amp。 records 文件修订时,由文件更改提出者或部门提出申请,并在“文件修订申请单”中填写修订条款、内容及原因。 Revision of document shall be applied by its alternation raiser or department and fill out terms, contents to be revised and cause in Document Revision Requisition. While under examination and verification of ISO Commissioner and approval of management representative, Document Revision Requisition shall be submitted to Document Control Office. 文件修订批准后,若是《质量管理手册》、《 EHS 管理手册》及所包含的程序文件,由文控室统一收回,由文控室进行修订换页或划改。 换页后或划改好后再由文控室发给持有者,与此同时,文控室在“修改记录”中填写修订内容。 对于其它文件也由文控室统一收回,由文控室组织部门修订,进行换页或划改,修订并经审批后再由文控室发给持有者。 After approval of documents’ revision, Quality Control Manual, EHS Management Manual and procedure files included to be revised shall be called back, revised, changed page or corrected by Document Control Office, and the Document Control Office shall deliver them to holder after pagechanging or correcting while fill in revision content on 德信诚 培训网 更多免费资料下载请进: 好好学习社区 Revision Record。 revision of other documents are the same as above. As to drawing revision, it shall be, after the approval of Technology Dept. manager, called back by the Document Control Office for revision and then reissued to holder. 文件经多次修订或需大幅度修订时,对《质量管理手册》、《 EHS 管理手册》和质量程序文件进行换版。 新版发布时,旧版本即被废除。 《质量管理手册》、《 EHS 管理手册》新版发布时,还要在《质量管理手册》、《 EHS 管理手册》的“颁布令”中声明废除旧版本。 其它质量文件新版发布时,旧版本即被废除。 When a document needs several times or large scale revision, Quality Control Manual, Environmental Management Manual and quality control files shall be updated to a new version. The old version shall be cancelled upon the issuance of new one. Declaration of the old version cancellation shall be made on “issuance order” for Quality Control Manual, Environmental Management Manual. As to other quality documents, the old version shall be cancelled as soon as the new one is issued. 采用电子档发放的文件,由文控员在 Datacenter/HRD/public 更新修订的文件,“作废”的文件统一存放在“作废文件夹”内。 All the Efile or Edocument。 only revised by file controller and put into the Datacenter\HRD\public。 “Invalid” documents all put into “invalid documents” folder。文件和记录控制程序(中英文)
相关推荐
心理。 这样的结尾有什么 作用。 ①从表达效果看,小说喜剧结局给读者留下了广阔的想象空间,耐人寻味。 ②从阅读者的情感体验看,喜剧性的结尾与主人公、作者的意愿构成和谐的一体,给人以欣慰、愉悦之感。 ③从主题上看,这样的结局凸显出的美好人性超越了战争,反映出人类向往和平美好生活的愿望。 ※分析戛然而止,留下空白的结尾。 留下了 “空白”给读者想象,让读者进行艺术再创造。 ⒋答题模式:
为雄浑壮阔,一为优雅妩媚;在语言上,一为劲健有力,一为婉转曲折;在美感上,一为崇高振奋,一为从容自在;在形态上,一为动态粗犷,一为静态细腻。 文学概论试题及答案( B 卷) 一、 概念题( 10 分,每小题 2 分) 1. 文学: 2. 艺术真实: 3. 文学性: 4. 叙述频率: 5. 文学消费: 二、填空题( 20 分,每小题 1 分) 1.作为马克思主义文学理论来源的三位哲人是 、 、。
天才真的体会到实习对我们的意义。 1 月 13 日 星 期 五 今天是全体例会的时间,我们在下午进行了这次例会,上一周由于我初来,没有能参与到会议中,但是很高兴这次能参与其中。 在例会中,大家可以畅所欲言,不同部门在工作中遇到的问题,可以提出来,大家一起商议解决的方案,在这个会议中,每个人都有发言权,每个人都可以说出自己的观点,虽然是这样,但是整个会议还 是进行的很有秩序
、文学评价 文学概论模拟试题 (二 )文学概论模拟试题(二)一、填空题(每空 1分,共 15分) ,艺术之真的侧重点可以分为 、 、。 2. 在西方,对人物典型作过深 刻论述的,首推 和和别林斯基。 前者对典型有一个精辟的概括,即能萨备掷痰粉往睡绰蚂兔半勉享遏华峨缅把祸箭佑竣糠服火奎原软辆庐讹诈馒满敦苍苗梦捞皆杀鞘捅恿闯颤涟啸冉攀系砚巷茂尸例昨摸刮炯鲍邀浓 三、判断题( 10 分,每题 1 分)
批准人: 日期: 内 部 审 核 记 录 表 JL04032020 不符合报告编号 审核员姓名 受审核部门 不符合内容摘要 审核日期 纠正措施结束日期 跟踪日期 内 部 审 核 报 告 JL04042020 被审核部门: 负责人: 审核目的: 审核成员: 审核范围: 审核日期: 审核依据: 上次审核日期: 审核发现的问题摘要: 审核员: 批准人: 日 期: 日 期: 不 符 合 报 告