某工程项目材料设备进场检验程序内容摘要:
Page 5 of 8 When the supervision engineer thinks that the product certificate of conformance or inpection test report is still not enough to prove that the arrived product satisfies the relevant quality requirements, he can request for conducting reinspection tests or w itnessed sampling tests. These tests shall be conducted in a third party lab, which w ill issue the test reports to verify whether the quality is in conformance (who will pay the costs?) 获得合格确认 的材料进入施工现后,到其使用或安装时通常要经过一定的时间间隔,如果对 材料的存放、保管疏忽,可能导致材料质量状况的恶化,如果此类事件发生,监理工程师有权对其再次检验,视检验结果再确定是否准用或降级使用。 After the positively verified materials enter the construction site, normally there is a time interval up to their installation or services. If the materials are not properly stored and maintained, it is likely to result in quality degradation. When such an incident occurs, the supervision engineer shall have the right to conduct an inspection again. Whether the materials are allowed to be used or used as lower standard materials shall be dependent on the inspection results. 对于检验不合格的材料不得进入施工现场,并对其进行标记、追踪,防止二次进入现场的可能。 Materials that fail to pass the inspection shall not be allow ed to enter the construction site. They shall be identified and tracked so as to prevent them from entering the construction site again. EQUIPMENT INSPECTION REQUIREMENTS 备检验要求 6. 1 设备进入现场前,承包商应向 XXX工程师提交 《工程物资进场报验表》,见 附表A4。 Before the equipment entering the construction site, the contractor shall submit to the XXX engineer the “Project Material AsReceived Inspection Form” (see attached A4). 6. 2 提交报审表时 应该提供设备出厂合格证及技术说明书、质量检验证明、有关图纸和技术资料。 经 XXX工程师审查合格,在报审表上签认后设备方可进入施工现场。 The equipment exwork certificate of conformance and technical instructions and quality inspection documents shall be provided when submitting the inspection application form. The equipment cannot enter the construction site until the above documents are reviewed and the inpsction application form is signed off by the XXX engineeer. 6. 3 设备进场后, XXX工程师应组织承包商在规定的时间内检查,供货方应派人参加,按供货方提供的设备清单及技术说明书、相关质量控制资料检查验收,经检查确认合格则验收人员签署验收单。 After the equipment enters the cosntruction site, the XXX engineer shall anize the contractor to carry out related inspections, within specified timing, which shall be attended by supplier representativ。某工程项目材料设备进场检验程序
相关推荐
精度要求的数据为依托。 ② 积极做好确认签证制度工作,使每一道施工工序取得监理 工程 师的事前、事后认可。 ③ 施工方法在满足现行质量评定标准的前提下,力求实用和应用新工艺;质量标准在符合现行《验收评定标准》的基础上,实现本 工程 提出的 质量优良目标。 ④ 切实组织落实本 工程 所制定的各种保证措施及创优规划。 二、具体施工方案 (一 )雨、污水管道施工 本合同段的雨、污水管道的施工
. 排泥底阀控制管线安装 主要 3. 管道及支架防腐 主要 3.3 电气安装工程 一般 3. 电缆线路工程 一般 3. 配管及管内穿线工程 主要 3. 成套配电柜及动力开关柜安装 主要 3. 电机的电气检查及接线 主要 3. 滑触线安装 一般 3. 电缆桥架安装 一般 3. 电气照明器具安装 一般 3.4 自动化仪表安装工程 主要 3. 仪表管路敷设 一般 3. 仪表安装 一般 3. 仪表调校
渣 施工。 石渣最大粒径 15cm。 石渣填筑采用挖掘机进行抛填,第一层抛填厚度控制在 50cm以内,其余填筑厚度控制在 30cm 以内,方法为进占法。 由挖掘机在作业半径内均匀抛第一层石渣完成后,采取来回走动的方式进行初压,观察石渣基本稳定后采用 18 吨振动压路机静压,若石渣无明显沉降后,可进行第二层填料,完成后用同样方法进行碾压,之后向前延伸进行下一段施工,第二层铺筑完成后,统一采用
及其家属、子女违法违纪的。 第六章 附则 第十九条 本细则由医院纪律检查委员会、组织人事处负责解释。 第二十条 本细则自发文之日起试行。 今后,中央和省、市有新的规定,按中央和省、市的规定执行。 三、党政领导干部廉洁勤政的规定 自觉坚持以病人为中心,搞好医疗服务,尽职尽责,努力工作,顾全大局,严守纪律,做到令行禁止,同党中央在思想上、政治上、行动上保持高度一致。 自觉坚持民主集中制原则,重
企业税务登记证(复印件); ISO9001系列质量管理体系认证证书(复印件); 邀请函及谈判文件 规定的其他资格文件; 谈判方近三 年的同类投标物资供货业绩及相关证明(附中标通知书或合同或用户证明复印件); 谈判方近两年经会计师事务所出具的审计报告及财务报表(复印件) ; 谈判方 须提供正在实施的投标物资合同详细资料(合同数量及交货期等)并填写月生产供应能力分析表 (附表 5) ;