eastcarolinauniversitycontrolofhazardous内容摘要:

te all energy sources (secondary power supplies as well as the primary supplies). Never remove a fuse instead of disconnecting. LOCKOUT/TAGOUT Application of Devices All energyisolating devices are to be locked, tagged or both. Only standardized devices can be used and they are not to be used for anything else. Use a lockout device if your lock cannot be placed directly on the energy control. When lockout is used, every employee in the work crew must attach his personal lock. LOCKOUT/TAGOUT Release of Stored Energy Inspect the system to make sure all parts have stopped moving. Relieve trapped pressure. Block or brace parts that could fall due to gravity. Bleed lines and vent valves open. If stored energy can reaccumulate, monitor it to make sure it stays below hazardous levels. LOCKOUT/TAGOUT Verifying Equipment Isolation Make sure all danger areas are clear of personnel. Verify that the main disconnect switch or circuit breaker can’t be moved to the on position. Press all start buttons and other activating controls on the equipment itself and return controls to the off position when the testing is plete. LOCKOUT/TAGOUT Performing the Work Look ahead and avoid doing anything that could reactivate the equipment. Don’t bypass the lockout when installing new piping or wiring. LOCKOUT/TAGOUT Removing Lockout/Tagout Make sure the equipment is safe to operate by removing all tools from the work area and making sure the system is fully assembled. Safeguard all employees by conducting a head count to make sure everyone is clear of the equipment. Also notify everyone in the work area that lockout/tagout is being removed. Remove the lockout/tagout devices. Each dev。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。