improvingaccesstoappropriatepaediatricart内容摘要:

ty polyethylene (HDPE) bottle with two piece childresistant closure (outer shell white high density polyethylene, inner shell natural polypropylene) with a low density polyethylene (LDPE) foam liner. Each bottle contains 240 ml of oral suspension.  Clear polypropylene 5 ml dispensing syringe with silicone rubber piston seal.  Clear low density polyethylene bottlesyringe adapter. Dr. Pog225。 ny WHO, Geneva 17/34 VIRAMUNE 50 mg/5 ml oral suspension  Infants under the age of 3 months: safety data is available from clinical trials up to 6 weeks of treatment in 179 newborns and infants 3 months of age (see section ). Dr. Pog225。 ny WHO, Geneva 18/34 VIRAMUNE 50 mg/5 ml oral suspension Patients aged 2 months up to 8 years  The remended dose for patients 2 months up to 8 years is 4 mg/kg once daily for two weeks followed by 7 mg/kg twice daily thereafter. The total daily dose should not exceed 400 mg for any patient. Patients aged 8 years up to 16 years  The remended dose for patients 8 years up to 16 years is 4 mg/kg once daily for two weeks followed by 4 mg/kg twice daily thereafter. The total daily dose should not exceed 400 mg for any patient. Dr. Pog225。 ny WHO, Geneva 19/34 Zerit174。 200 mg powder for oral solution  The reconstituted solution contains 1 mg of stavudine per ml.  Cherry flavour Methylparaben Propylparaben  Silicon dioxide Simethicone Sodium carmellose  Sorbic acid Stearate emulsifiers Sucrose  2 years.  After reconstitution with water, store the solution in tightly closed bottles at 2176。 C to 8176。 C.  HDPE bottle with child resistant screw cap, fill mark (200 ml of solution after constitution) and measuring cup. Dr. Pog225。 ny WHO, Geneva 20/34 Retrovir174。 100 mg/10 ml, oral solution  10 ml of solution contains: Zidovudine 100 mg  Retrovir 100mg/10ml oral solution/syrup:  A clear, pale yellow, strawberryflavoured, sugarfree oral solution.  The pack contains an oraldosing syringe which should be fitted to the bottle before use.  Maltitol solution Glycerol Citric Acid  E211 Sodium Benzoate Saccharin Sodium  Flavour Strawberry Flavour White Sugar Purified Water  2 years. Discard oral solution 1 month after first opening bottle.  Do not store above 30176。 C. Store the bottle in the original outer carton. Dr. Pog225。 ny WHO, Geneva 21/34 Retrovir174。 100 mg/10 ml, oral solution  Retrovir Oral Solution/Syrup:  200ml amb。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。