diodecircuitsapplications内容摘要:

ircuits (1) Since virtually any nonlinear chtic is approximately linear (straight) if we consider a sufficiently small segment THEN We can find a linear smallsignal equivalent circuit for the nonlinear device to use in the ac analysis The small signal diode circuit can be substituted by a single equivalent resistor. Linear Small Signal Equivalent Circuits (2) dc supply voltage results in operation at Q An ac signal is injected into the circuit and swings the instantaneous point of operation slightly above and below the Q point For small changes DQDDD vdvdii iD –the small change in diode current from the Qpoint vD –the small change in diode voltage from the Qpoint (diD/dvD) – the slope of the diode chtic evaluated at the。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。