张惠娟副教授mszhj@163com内容摘要:
located to a job only if the job is in memory). A job is swapped in and out of memory to the disk. Online munication between the user and the system is provided。 Online system must be available for users to access data and code. 21 PersonalComputer Systems Personal puters – puter system dedicated to a single user. I/O devices – keyboards, mice, display screens, small printers. User convenience and responsiveness. Can adopt technology developed for larger operating system’ often individuals have sole use of puter and do not need advanced CPU utilization of protection features. 22 23 Parallel Systems Tightly coupled system – processors share memory and a clock。 munication usually takes place through the shared memory. Advantages of parallel system: Increased throughput Economical Increased reliability 24 Parallel Systems Symmetric multiprocessing (SMP) Each processor runs an identical copy of the operating system. Many processes can run at once without performance deterioration. Most modern operating systems support SMP Asymmetric multiprocessing Each processor is assigned a specific task。 master processor schedules and allocates work to slave processors. More mon in extremely large systems 25 Symmetric multiprocessing 26 Distributed Systems Distribute the putation among several physica。张惠娟副教授mszhj@163com
相关推荐
句时,即可称为修辞性疑问句。 需要注意的是:肯定的修辞疑问句其意义相当于强调的否定陈述句;而否定的修辞疑问句其意义则相当于强调的肯定陈述句。 What Mary does every day is (to) give piano lessons. Can anyone doubt the truth of his statement? 谁能怀疑他陈述的真实性。 = Surely no one
最佳实践 0,1 2,3 4,5,6 7,8,9 0,1,2 3,4,5 6,7,8,9 0,1,2,3,4 5,6 7 8,9 T o p 1 0 0 Ca s e St u d ie s O f T h e Ye a r s . t o p 1 0 0 s u mmit . c o m 全 球 软 件 案 例 研 究 峰 会 如何实现分片 • 作业服务器自行计算分片 – 无中心化 –
主要著作和成果 • 《 AIC辅助信道 》 专著,浙江音像出版社 • 《 电子线路 》 教材上下册主编 ,中国广播电视出版社 • 《 发明百例评点 》 山西教育出版社 • “ 电视技术的现状与对策” 《 电视
断甲、乙、丙三种液体的名称:甲 ,乙 ,丙。 (2)甲的蛋白质为 7080,而乙为微量,这是由于 ____________。 (3)乙的葡萄糖为 1,而丙的为 0,这是由于。 (4)乙的尿素 ,而丙的为 ,这是由于 _______________。 课堂练习 原尿血浆 大分子蛋白质没有 尿液葡萄糖被 肾小管 全部重吸收 原尿中大部分水被吸收, 尿素没被吸收,尿素的浓度增大了
或尼卡地平 5 mg/h IV, 可每 5–15 分钟增加 mg/h, 最大量为 15 mg/h。 或其它药物 (如肼苯哒嗪 , 依那普利等 ) (Ⅱ a级推荐, C级证据 ) 急性再通患者血压调控 ( AHA/ASA 2020指南推荐) 如 BP 185/110 mm Hg, 避免使用 rtPA; 在 rtPA或其它急性再通治疗中和治疗后 24小时: 将血压维持在 ≤180/105 mm Hg