pec土木工程英语证书考试-施工专业术语大全内容摘要:
ription of construction 施工说明书 construction specifications 施工台架 builder39。 s staging 质量保证计 划 quality control system 质量保证控制程序 quality assurance operating procedure 质量保证手册 quality control (assurrance) manual 质量保证体系 quality assurance (control) system 质量保证验收标准 quality assurance acceptance standard 质量保证制度 quality certification system 质量变坏 debase 质量标准 quality level; quality specification; quality specifications; quality standard 螺栓 bolt; gudgeon; screw bolt; threaded bolt 螺栓柄 grip of bolt 螺栓端 bolt end 螺栓杆 bolt shank; shank of bolt 螺栓杆 bolt shank; shank of bolt 螺栓钢料 bolt stock 螺栓固定 bolting 螺栓和螺母 screw bolt and nut 螺栓挤压 bolt shank extruding 螺栓间距 pitch of bolts 螺栓紧固 bolton; boltup 螺栓孔 bolt hole; holes for screw 螺栓孔数量 number of bolt hole 螺栓孔直径 diameter of bolt hole 螺栓连接 bolt connection; bolt fastening; bolt joint; bolted connection; bolting; pin connection 螺栓直径 diameter of bolt 螺栓中心圆直径 diameter of centre hole in bolts 螺栓有效长度 grip 吊车 crane; crane truck; derrick truck; hoisting machine; sling van; suspended ceiling 吊车臂 arm of crane; crane boom; gib arm of crane 吊车吊架 crane link 吊车钢轨 steel beam for crane 吊车钢丝绳 crane rope 吊车轨 crane rail 吊车过头防止装置 hoist overwind device 吊车梁 crane (runway) girder 开窗装置 windowing facility 平台 deck; flat; flatbase; flatform; floor; gallery; level table; plain stage; platform; surface plate; table; terrace 平台式框架结构 platform frame construction 罐 jar; kettle; pot; tank 罐底 tank bottoms 电站 electric station; generating plant; power plant; power station 电站布置 layout of power station 电站厂房上部结构 powerhouse superstructure 电站厂房下部结构 powerhouse substructure 电站地上部分 powerhouse superstructure block 电站地下部分 powerhouse substructure block 电站锅炉 station boiler; utility boiler 电站汽轮机 power station steam turbine; steamturbine for power plant 电站设备 power station equipment 电站输 水道 plant waterway 电站位置 plant location 电站装机容量 installed capacity of power station; installed plant capacity 污水处理厂 sewage treatment works 污水处理场 sewage disposal plant; sewage farm; sewage thertment plant; waste water treatment 污水处理系统 sewage disposal system; sewage treatment system 污水处理装置 sewagetreatment plant 污水净化池 sewage purificer 污水滤池 sewage; sewerage filter 污水量配池 dosing chamber; dosing tank 污水渗井 leaching cesspool; pervious cesspool 循环水系统 circulating water system; circulation 烟囱 chimney; chimney flue; chimney stack; funnel; heating tube; shaft; smoke pipe; smoke stack; stack; stovepipe 烟囱标志 funnel mark 烟囱标志灯 funnel light 烟囱抽风 chimney draught; chimney ventilation; stack draught 烟囱抽气罩 chimney aspirator 烟囱出灰门 soot door of chimney 烟囱调节风门 funnel damper 烟囱顶部 chimney top; chimneyhead 烟囱顶盖 chimney pot 烟囱顶罩 funnel apron; funnel bon; funnel cap; funnel umbrella 烟囱泛水 chimney flashing 烟囱废气 stack gas 烟囱风挡 chimney damper 烟囱风帽 chimney cap; chimney cowl 烟囱风门 chimney damper; damper of chimney 烟囱盖 funnel cover 烟囱高度 chimney height; stack height 烟囱隔板 withe; wythes 烟囱基座 funnel base 烟囱截面 stack cross section 烟囱连接段 connected stack 烟囱内衬 chimney lining; flue lining 烟囱排放 smoke stack emission 烟囱漆 funnel paint 烟囱身 chimney shaft 烟囱头 smoke stack head 化学水处理 chemical water treatment 沥青混凝土 asphalt concrete; bituminous concrete 沥青冷底子油 asphalt primer; asphaltic base oil; bituminous primer; bituminous priming solution 沥青块 asphalt blocks 沥青卷材屋面 asphalt prepared roofing; asphalt roll roofing; bitumen felt roofing 沥青结合层 asphalt binder course; asphalt intermediate course; bituminous binder course 沥青绝缘 bitumen insulation 沥青混凝土路面 asphalt concrete pavement 沥青锅 asphalt heating pot 沥青防潮层 asphalt dampproof course; bitumen dampproof course 沥青薄膜防水 asphalt membrane waterproofing 沥青拌和装置 bituminous mixing plant 沥青 asphalt; asphalt(um); asphaltum; bitum; bitumen; mineral pitch; pitch; tar 沥青拌合料压成的路面 road mix surface 沥青比值 bitummen ratio 油漆 coating pound; oil paint; oil varnish; paint 油漆工程 painter39。 s work 抹灰 plastering; rendering; troweling 抹灰凹圆角 plaster cove 抹灰板条 firring; furring; lath; rendering lath; single lath 抹灰爆裂 blowing of plaster 抹灰层 floated coat 抹灰打底 key rendering; pricking up; rendering 抹灰的底层 key floating 抹灰的墙 plastered wall 抹灰底层 key for plaster; plaster base; primary coat; rendering coat 抹灰顶棚 plastered ceiling 抹灰格间 floating bay 抹灰工灰板 plasterer39。 s hawk 抹灰工抹子 plasterer39。 s float 抹灰工手锤 lath hammer 抹灰刮板 wet screed 抹灰厚度 depth of plastering; thickness of plastering 抹灰护角条 plaster bead; plaster head; plaster staff 抹灰灰浆 rendering mortar 抹灰基层 plaster base 抹灰基层修整 dubbing out 抹灰空鼓 gaul 抹灰麻刀 plasterer39。 s hair 抹灰面层 finish coat of plaster; finish plaster; plaster skin coat; setting coat 抹灰面疵病 plastering defect 抹灰面发裂 crazing of plaster 抹灰面刮尺 floating rule 抹灰泥刀 plasterer39。 s trowel 抹灰腻子 plasterer39。 s putty 抹灰平顶 flat plaster ceiling 抹灰砂 plastering sand; rendering sand 抹灰饰面 floated finish 抹灰天花板 plaster ceiling panel; plaster ceiling slab 抹灰托板 hawk 抹灰脱层。pec土木工程英语证书考试-施工专业术语大全
相关推荐
境温度、软化卷材表面以便于施工,而非热熔卷材)。 3)、 相邻两排卷材的短边接头应相互错开 1/3 幅宽以上,以免多层接头重叠而使得卷材粘贴不平整。 保证措施 1)、 进行钢筋垂直、水平运输时,遵守轻拿轻放的原则,钢筋吊放点采用 木板等临时保护措施,避免钢筋扎破卷材。 2) 、绑扎钢筋过程中,如移动钢筋需要使用撬棍,应在其下设木垫临时保护,以避免破坏防水卷材。 3) 、在施工过程中
管的插口端还需插入不锈钢内套管。 密封圈距插口端部的距离应按不同管径而定,公称外径为 63mm 时的距离为 20mm,公称外径为 32mm 时的距离为 10mm,然后将管材插入连接件内,将锁紧螺母锁紧,不留余扣。 聚乙烯管与聚氯 乙稀管连接时应将聚氯乙稀管材直接插至连接件的尽头,然后将密封圈、压圈压入连接件口内,再将锁紧螺母锁紧。 锁紧时宜用专用扳手,螺母要对扣,用力要适中,不得用蛮力。
定期召开施工进度工程例会,协调和解决施工过程中出现的相关问题,根据实际情况及时调整相关计划(如材料、设备、劳动力等),以保证总施 工进度计划按期完成。 c. 对施工用的管桩、焊条等材料及机械设备要加强计划性管理。 施工技术管理 :工程开工前,由项目部组织有关人员进行图纸自审及参加设计交底工作。 认真做好此项工作,做好施工技术交底工作,使施工人员了解施工意图、施工方案的统筹安排、施工方法、工艺标准
本操作功能窗口、参数设定窗口等若干页,通过选择按钮可以 切换。 其中有如下几种类型的窗口对于每一种对象的作用都是一样的,在此说明 窗口公共部分说明 对象的消息状态组标示,用于显示该对象现在的是否有报警 /警告 /错误等状态。 确认该对象所属消息 允许消息 请求屏蔽消息 消息被屏蔽 未被批占用 被批占用 (此标示使用 SIMATIC BATCH 才有意义) 第 12 页 共 34页 下拉菜单
类。 用户 根据 分类定位适合自 身 的 理财 产品类型。 6 产品信息 展示 投资 理财是 投融资 平台的最核心功能模块, 该 模块 主要向 终端客户 展示 产品的基本信息, 如下图 所示。 通过 投资 理财 功能,用户能够关注到 以下 内容:产品的年化利率、投资期限、本金额度、 投资金额 ( 或 限额) 以及 目前的产品的基本情况( 投资金额 情况) . 产品 投资模块 如果 用户 相关