amixbetweeneastandwestwang39smusic内容摘要:

s ever done this before in hip hop, in the hip hop world….. 4 Chinkedout?  “Chink” is an insult word from an earlier era, when Caucasians in North America often referred to Chinese people as “chinks”, and yes, it was and is a slur word. But now an “ABC” singer from Taiwan — that’s “AmericanBorn Chinese” person, or ABC, sometimes called ABT for AmericanBorn Taiwanese — named Lee Hom Wang (stage name just Lee Hom) is releasing an album called Unparalleled Hero that calls itself “chinkedout” music.  Apparently, ChinkedOut is a new musical style created by Lee Hom himself, which blends Chinese traditional music with Western hiphop rhythms.  Wonder what the PC police will say about this new term。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。