zrj3系列预抽真空保护气氛多用炉属于我公司独家专利,专利号:20xx20xx6581(编辑修改稿)内容摘要:

料状态,自动输出不同功率和辐射波长,完成矿砂在炉内自由落体运动过程中的不同烧结膨化结壳真空成球工艺曲线,确保全自动烧结过程产品完全合格。 该产品投产至今已运行三年,基本无故障,产量大,效率高。 The glassy perlite vacuum chamber of beads is widely used abroad, but China perlite products are the most primitive lowgrade vacuum obturator nonexpansion plant introduced the world39。 s most advanced technology in 2020 .and we have already developmented and producted the first successful expanded perlite electric furnace in China, of which all technical performances have reached the world39。 s most advanced level. The procedure of products uses microputer technology curve highprecision automatic temperature control and rapidly tracks the blanking state , then it will automatically output different power and wavelength of radiation, also the ores will plete the process of the freefall campaign for making the different expanding ,crust , vacuumin and sintering into the 6 technology curve ball in the heater, so it will ensure that the products are fully qualified in the automatic sintering process . The product has already been operating into production for three years which is basically troublefree, in addition, its yield is very large and efficiency is very high 近年来经过我厂高级工程师珍珠岩膨胀电炉发明人孔可强到美国、加拿大、欧洲调研学习珍珠岩玻化微珠膨化的先进技术,以及保温砂浆应用技术,对珍珠岩膨胀电炉进行重大改进,生产出新一代珍珠岩膨胀电炉,真空球珍珠岩玻化微珠产量比原膨胀电炉提高一倍,高达 30 吨 /天,电耗大幅下降,原膨胀电炉 700kg/小时,用电 480 度,新型膨胀电炉用电仅300400 度,而且对火山石选择范围扩大,任何品种火山石珍珠岩矿砂均可膨化成功,尤其近期俄罗斯发给我厂海沙样品 5 吨,经调整微电脑工艺膨化实验全部成功,经分析俄罗斯东海岸海沙为火山灰形成, 膨化后产品为高品位完整真空球玻化微珠。 为开辟火山灰海沙资源开创了取之不尽的广阔矿产资源,目前我厂已在我国沿海岸取沙样做实验。 In recent years, After the senior engineer and the inventor of the expanded perlite electric furnace KongKeqiang went to the United States, Canada and the European to research and study the advanced technology of making the expanded perlite glassy beads , as well insulating mortar techniques,our plant made the expanded perlite electric furnace very significantly improve, which product a new generation of the expanded perlite electric furnace, and pared with the former ,the output of the new vacuumperlite glassy beads is doubled, up to 30 tons / day, moreover,the electricity consumption decreased significantly, the original expanded perlite electric furnace consums electricity 480 degrees for 700 kg / hour , yet the new expanded perlite electric furnace only 300400 degrees, furthermore ,the chamber choice is to expand widely ,and the scope of any species volcano stone perlite ores can be expanded successfully, especially in recent days,an Russian factory sand five tons sea sands samples to our plant, and the expansion experiment about that is fully successful through adjusting microputer technology, It is analyzed that the Russian East Coast sand are formed from the volcanic ash, after expansion ,they will bee the highgrade and integrity vacuum perlite glassy beads. Thus,it will creat the inexhaustible and vast mineral resources for opening up the volcanic ash and sea sands resources, At present ,our plant have already bigun to sample sandlike to make experiments from the coast in China . 玻化微珠保温砂浆产品说明 Vitrify Micro Beads Insulation Mortor Productis Introduction 玻化微珠材料生产的干粉保温砂浆。 具有优良的保温隔热性能和防火耐热抗老化性能,不空鼓开裂。 强度高。 施工时加水搅拌即可使用,可直接施工于干状墙体上,施工性好。 弥补了聚苯颗粒和普通膨胀珍珠岩轻骨料保温砂浆中的诸多缺陷和不足,克服了膨胀珍珠岩骨料吸水性大,易粉化,体积收失率大,易造成产品后期强度低和空鼓开裂,降低保温性能等现象,同时弥补了聚苯颗粒有机材料易燃,防火性能 差,高温产生有害气体,耐候性低,施工中反弹性大等缺陷,提高了干粉料保温砂浆的综合性能和施工性能。 Dry powder insulation mortar produced by vitrify micro beads material, have excellent insulation and fire proof heat resistant properties, never crack whith high strength. Construction of mixing water can be used directly in drywall construction, the construction is good. Made up for polystyrene particles and the general perlite insulation mortar lightweight aggregate in the various defects and shortings,it also overes expansion perlite aggregate absorbent, easy powder, or loss of volume, could easily lead to products low intensity and cracking later , thermal insulation properties to reduce the phenomenon, but made up for a polystyrene particles Machine flammable materials, the poor performance of fire, the 7 formation of harmful gas temperature, weathering of low, big rebound in construction defects such as improved insulation mortar dry powder material properties and construction properties. 一 .特性 ,质量稳定可靠,容重轻,保温性能好。 ,不空鼓开裂,附着力强 ,施工周期短,并有良好的施工性能。 ,吸音,透气,耐水,耐冻等性能。 环保无害,性价比高,综合性能优,耐老化性好。 first. Characteristics 1. Vacuum ball perlite glassy beads is dry powder materials, stable and reliable quality, bulk density light, good thermal insulation properties. 2. High strength, no cracking, strong adhesion, short construction period, and the construction of a good performance. 3. Have excellent fire, acoustic, breathable, waterresistant, coldresistant properties. 4. Vacuum ball perlite glassy beads are inanic materials. Environmentalfriendly, costeffective, superior performance, antiaging and good. 二.适用范围: Scope of Application: 真空球珍珠岩玻化微珠适合于各种墙体内外保温及分户隔墙,楼层,通道。 地下室和地面采暖等部位保温。 适用于涂抹在大模内置。 保温体系表层做保护层。 性能指标: Vacuum ball perlite glassy beads are suitable for all kinds of internal and external wall insulation and household wall, floor and access. The basement and ground sites, such as heating insulation. Apply to smear embedded in the module. Thermal insulation system to protect the surface layer. Performance indicators: 检查项目 指标要求 检验结果 Items Indicator Test Results 干密度 Dry Density 浆体密度 Slurry Density 导热系 数 Heat Conduction Coefficient 抗压强度 Compressive Strength 粘结强度 Donding Strength 抗拉强度 Tensile Strength 体积收缩率 Volume Shrinkage 憎水率 Hydrophobic Rate 石棉含量 Asbestos Content 抹面抗裂砂浆产品说明 Float ore Work resist Fissure Mortar Products Instruction 8 抹面抗裂砂浆是一种具有优异防水抗渗抗裂性能的特种干混砂浆,是以进口高 分字 (子 )改性材料和。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。