土木工程外文翻译---混凝土结构配筋设计-建筑结构(编辑修改稿)内容摘要:

cture reinforcement transformation necessary use39。 s technology 1) The request trades the technology It is the joist (either truss) opens the column (or wall), the joist terminal and the joist trades technologies and so on column to call generally。 Belongs to one kind of prehensive technology, by the related structure reinforcement, the superstructure goes against rises with to reposition as well as abandons technologies and so on ponent demolition to be posed。 Is suitable in had building39。 s reinforcement transformation。 Compares with the traditional practices, has the construction time to be short, the expense low, affects and so on merits slightly to the life and the production, but is high to the specification, must plete by the skilled worker, can ensure the security. 2) Plants the muscle technology It is one item is simple and direct to the concrete structure, the effective connection and the anchor technology。 May implant the ordinary steel bar, may also 5 implant the bolt type anchor muscle。 Has widely applied in had building39。 s reinforcement improvement project, for example: In the construction leaks buries the steel bar or the steel bar deviation designs the position the recovery, the ponent increases the section reinforcement to make up the muscle, the superstructure expands cross, goes against rises to Liang, column39。 s lengthening by joining, the house superimposed layer terminal and the highrise construction addition shearing force wall plants the muscle and so on. 3) Crack patching technology According to the concretes crack39。 s cause, the character and the size, use seal differently protect the method to carry on patching, one kind of skill which causes the structure because to crack reduces the use function which and the durability can restore。 Is suitable in had in the building each kind of crack processing, but to the stress crack, besides patching, still should use the corresponding reinforcement measure. The internal patching law is with the forcing pump the ceme nting material pressure concretes crack, renders the young or up and ing generation to sew up the function, and makes the original structure through its cementation to restore the integrity, this method is suitable for the crack opening is big, and durable and so on is influential to the structure integrity and the security, or has request and so on waterproof antiseepage crack patching. 4) Carbonized concretes repair technology It is refers to through restores the concretes the alkalinity (inactivation) or increases its impedance to enable the steel bar corrosion which the carbonization creates to obtain the containment technology. 5) Concretes surface treatment technology It is refers to uses cleaning up concretes surface stains, the oil mark, the residual as well as the other attachment and so on chemistry method, mechanical method, sand blasting method, vacuum cleaning method, injection method skill. 6) Coagulation mantle of soil seal technology It is refers to uses flexible methods and so on aquaseal backfill, polymer grouting, paint film to carry on the waterproofing to the concretes, moistureproof and against crack processing technology. Like the structure, the ponent shift the technology, the adjustment structure base frequency technology and so on. 7) Other technologies Like the structure, the ponent shift the technology, the adjustment structure base frequency technology and so on. 2 Brickingup structure Brickingup structure reinforcement method: The brickingup structure39。 s reinforcement divides into when the direct reinforcement and reinforces two kinds 6 indirectly, the design, may act according to the actual condition and the operation requirements choice being suitable method. suitable for the brickingup structure direct reinforcement method 1) outside reinforced concrete superimposed layer reinforcement law This law belongs to the pound section reinforcement method one kind. Its merit is the construction craft simple, patible, after the brickingup reinforcement, the supporting capacity has enhances greatly, and has the mature design and the construction experience。 Is suitable in the column, the belt wall wall reinforcement。 Its shorting is the scene construction wet operating time is long, to produces has certain influence with the life, and after reinforcing the building clearance has certain reduction. 2) outside reinforced concrete mortar superimposed layer reinforcement law This law belongs to the pound section reinforcement method one kind. Its merit and outside the reinforced concrete the superimposed layer reinforcement law is close, but enhances the supporting capacity to be inferior to the former。 Is suitable in the brickingup wall reinforcement, sometimes also uses in outside the reinforced concrete when the superimposed layer reinforcement belt engaged column wall the both sides put on the wall stirrup the seal. 3) the addition holds the engaged column reinforcement law Thi。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。